A new modern detached ADU in a backyard
New Detached ADU · Oakland, CA

New Detached ADU in Oakland - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
A small deck outside a new ADU
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
A kitchenette inside a converted garage
A new bathroom inside a converted garage
A former garage converted into a guest house
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Oakland

A new detached ADU in Oakland typically runs $280,000 to $520,000 all-in, from permit set through final inspection, depending on whether you’re building ground-up in the flatlands or complying with Chapter 7A fire-resistant construction in the hills. Most projects take 9 to 14 months from first site visit to certificate of occupancy. Ellery ADU Studio handles every phase under one contract at one written price, so the drawings, the permit set, and the construction are never split across blame-shifting parties. If you’re weighing a detached unit in Temescal, the Dimond, Montclair, or anywhere else in Oakland, call (971) 497-2402 and we’ll walk you through what your specific lot will actually require.

Workers installing steel structural framing for a new detached ADU construction. in Oakland, CA

Call (971) 497-2402

Why Ellery ADU Studio Is Oakland’s Preferred New Detached ADU Company

The bedroom inside a new ADU

We’ve designed, permitted, and built 900+ ADUs since 2015, and Oakland’s housing stock shows up in our work every single week. The city’s flatland neighborhoods are dense with Craftsman bungalows and Victorian cottages built between 1900 and 1940, most of them on unbolted cripple-wall foundations with detached garages that haven’t seen a structural review in decades. Our New Detached ADU team knows what those garages look like inside the walls, because we’ve opened enough of them. That’s the difference between a quote that holds and one that moves.

Oakland homeowners researching a six-figure decision tend to appreciate that more than a sales pitch. Every project is quoted with a written price before any work begins, per Haven Standard Clause 1. A live person answers our phones 24/7. And if you’ve already got a written estimate from another Oakland contractor, we’ll give you a free second opinion on it.

Our New Detached ADU Services in Oakland

A detached ADU in Oakland is not one product. It’s a category that splits by lot size, fire zone, existing garage condition, and what the city will allow on your specific parcel. Here’s what we build most often, and how each one plays out in Oakland specifically.

Custom Built ADU

Ground-up construction on Oakland lots runs from 450 to 1,000 square feet depending on your zone and remaining lot coverage. In the flatlands, where lots are 4,000 to 6,000 square feet, a custom build usually means a 1-bed or 2-bed unit with a small footprint and careful placement to preserve yard access. In the hills, custom means something else entirely: Class A roofing, ember-resistant 1/16-inch mesh vents, ignition-resistant siding, and enclosed eaves. Those are Chapter 7A requirements, not optional upgrades, and they must be in the permit set from day one or you’ll get a rejection letter and lose weeks.

Prefab ADU Installation

We specify and coordinate prefab systems from Cover, Dvele, and Boxabl within our single design-build contract. The advantage in Oakland is speed and predictability: the shell is fabricated off-site while we handle foundations, utilities, and site prep locally. Cover’s system, for example, is engineered to California seismic and energy code, which removes a significant variable when you’re building in a city where the soil shifts and the building department reads every detail. Prefab does not mean generic. The foundation, the utility trenching, the Chapter 7A detailing if you’re in the Very High Fire Hazard Severity Zone, the finish work: that’s all Oakland-specific, and it’s all on us.

Modular ADU

Modular construction in Oakland means a unit delivered in sections and set by crane, which works well on lots with alley access or a wide side yard. The flatlands have plenty of both; the narrow switchback streets off Highway 13 and Skyline Boulevard often don’t. We tell you that before you commit to a modular system, not after the crane shows up. Modular is not a way to dodge the permit process. Every module still gets a full permit set, still passes Oakland inspections, and still triggers the same fire-zone and seismic requirements as stick-built.

Studio ADU

This is the Oakland-specific conversation most homeowners don’t expect to have. Detached garages across the flatlands were built in the 1920s and 1930s for Model A-era vehicles: 8 to 9 feet wide, 18 to 20 feet deep. That’s useless for a modern car but almost exactly a conforming studio ADU footprint under Oakland’s current standards. In Temescal, the Dimond, and Eastlake, this is the fastest, lowest-disruption path on the menu, and it’s where our Oakland experience earns its keep. We know what those 1928 walls are hiding. More on that below.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

Trusted Brands We Service in Oakland

Some Oakland homeowners arrive knowing they want a Cover ADU. Others ask what a Dvele or Boxabl system would cost versus stick-built. We have working relationships with all three and coordinate them within the same single contract that covers our design, permit set, and site construction. That means you’re never the translator between a modular factory’s engineering team and a local foundation crew. We handle coordination, and if the factory drawing conflicts with Oakland’s building code, we catch it before it becomes your problem. Prefab and modular fluency is part of what we offer, not a separate service line with a separate set of paperwork.

Common New Detached ADU Problems We See in Oakland Homes

Oakland’s housing stock does specific things to detached ADU projects. Here’s what we encounter most, and how it changes your budget before you sign anything.

  • Unbolted cripple-wall foundations. Oakland’s flatland homes were built before modern seismic anchors became standard. Once you open the slab or the garage framing, the retrofit question isn’t optional; the city will require it. We write a seismic allowance into the contract so it’s a known line item, not a surprise change order.
  • Knob-and-tube wiring in old garages. A 1928 garage in Temescal or the Dimond was wired during the Hoover administration. If knob-and-tube is present, it gets replaced, period. We flag this in the initial structural review. If the garage was originally built as a garage, not conditioned space, the trigger points are different for fire sprinklers and electrical load.
  • Chapter 7A fire-zone requirements in the hills. Montclair, Joaquin Miller, and the Claremont hills sit in the Very High Fire Hazard Severity Zone. That’s a direct regulatory legacy of the 1991 Tunnel Fire, which destroyed more than 3,000 structures. Building there means Class A roofing, ember-resistant vents, ignition-resistant siding, and enclosed eaves. Submitting plans without those details gets a rejection. We spec them from the first drawing.
  • Oversized expectations on undersized garages. A 9-by-19-foot Model A garage converts beautifully to a studio, but it does not stretch into a 1-bed with a full bath without a variance. We tell you what the footprint will actually yield before you pay for drawings, not after you’ve fallen in love with a plan the city won’t approve.

Pricing for New Detached ADU in Oakland, CA

Here are the ranges we quote for Oakland’s market, all-in, drawings through final inspection.

Two construction workers installing a wooden frame for a new ADU in Oakland, CA
  • Garage conversion to studio ADU (flatlands, under 500 sq ft): $180,000 - $260,000
  • New detached studio ADU, ground-up (flatlands): $260,000 - $340,000
  • New detached 1-bed ADU: $300,000 - $410,000
  • New detached 2-bed ADU: $390,000 - $520,000
  • Hillside detached ADU with full Chapter 7A compliance (Montclair, Joaquin Miller, Claremont hills): add $35,000 - $70,000 for ignition-resistant materials and detailing

Those are written prices, per Haven Standard Clause 1. The number we quote is the number you sign, and under Clause 5, the scope is locked at signing. No door-side upsells, no scope creep. If a surprise appears inside a wall, we price it in writing and get your approval before we touch it. Call (971) 497-2402 for a written estimate on your specific Oakland lot. Estimates are free, and they name the dollar figure.

We Also Serve Cities Near Oakland

The local pros serve Oakland locally, and we also work in Oakland‘s neighboring cities: Alameda, San Leandro, Berkeley, and Castro Valley. The permitting rules shift at each city line, which is exactly why you want a studio that reads the local code before it draws the first line. If you’re in one of those cities, we apply the same written-price standard we bring to every Oakland project.

Serving Oakland, CA - Our Local Coverage Area

We’re serving the Oakland area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Oakland

The bathroom inside a new ADU

What Opening Up an Older Oakland Home Actually Reveals

Here’s what we’ve learned from 900+ ADUs: the single biggest reason a detached ADU quote moves in Oakland is what’s behind the existing walls. Outdated wiring. Undersized or damaged framing. Failed waterproofing on the old slab. Code upgrades the permit triggers once the garage is open. We handle this differently than most. We inspect first. We write allowances into the contract for the known unknowns, like seismic retrofit on a pre-1940 foundation. And if a genuine surprise appears, you get a fixed price in writing, and you approve it before we touch it. That’s Haven Standard Clause 5.

In Temescal, we converted a 9-by-19-foot detached garage from 1928 into a studio ADU. The original knob-and-tube wiring was spliced inside a rotted 2×4 wall, and the unbolted cripple-wall foundation had drifted enough to crack the slab. We stripped the garage to framing, wrote a seismic retrofit allowance into the contract, and used a Cover prefab shell redesigned to match the existing footprint, keeping the floor plan under 190 square feet to avoid triggering fire sprinklers. The client saw every cost in writing before the first hammer swung. That’s how a studio ADU in the Dimond should work.

One of the biggest local misconceptions we correct: assuming all Oakland ADUs need fire sprinklers. Flatland projects under 500 square feet typically do not. Hillside projects in the Very High Fire Hazard Severity Zone almost always do, if the ADU exceeds 500 square feet or the garage was originally conditioned space. Same city, completely different regulatory path. This page exists to tell you which triggers apply to your address before you call for a generic quote.

Get Your Written Price in Oakland

An attached garage converted into living space

If you’re ready to know what a new detached ADU will actually cost on your Oakland lot, call (971) 497-2402. You’ll get a written price before any work begins, a documented photo record on every visit, and a Done Right Promise in writing. The estimate is free. The number is real.

Written by Ellery ADU Studio bringing written-price design-build ADU work to Oakland.

Why Oakland Chooses Ellery ADU Studio

We set the standard for new detached ADU in Oakland.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Oakland

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Oakland Customers Say

Trusted by homeowners across Oakland and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N.

More ADU services in Oakland

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Oakland?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Oakland.

(971) 497-2402

Request a Free Estimate in Oakland

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Areas We Serve
Call Now - 24/7 Dispatch