A new modern detached ADU in a backyard
New Detached ADU · Roseville, CA

New Detached ADU in Roseville - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The sitting area and efficiency kitchen of a junior ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Roseville

A new detached ADU in Roseville typically runs $220,000-$380,000 all-in, from the first architectural drawing through final inspection, depending on square footage, site utilities, and the HOA review path your project has to clear. The piece most people miss: in Roseville, you’re not just getting a city permit. Most of the master-planned neighborhoods here require HOA architectural committee approval before the city accepts your application, and Roseville Electric has its own electrical forms and fee structure separate from PG&E. Miss either track and a straightforward ADU project stalls for weeks. That’s the part we handle. Ellery ADU Studio has designed, permitted, and built detached ADUs across Roseville since our founding, and we sequence the HOA packet, the city submittal, and the Roseville Electric load calculations as one timed workflow, not three separate surprises.

Workers installing steel structural framing for a new detached ADU construction. in Roseville, CA

Call (971) 497-2402

Call us at (971) 497-2402 to talk through your lot in Roseville. There is a written price before any work starts, on every project. That’s Haven Standard Clause 1.

Why Ellery ADU Studio Is Roseville’s Preferred New Detached ADU Company

A new two-story ADU over a garage

We’re a design-build studio, not a general contractor handing drawings to a sub. The permit set, the engineering, the construction, and the Roseville Electric subpanel coordination are one contract at one written price. That contract structure removes the designer-versus-builder blame gap that quietly wrecks a lot of Roseville ADU projects. If the finished ADU doesn’t match the permitted drawings, the Done Right Promise is in writing before we start.

Our work in Roseville spans the neighborhoods that make this city distinct: Fiddyment Farm, Westpark, Stanford Ranch, Woodcreek, Morgan Creek. We know the Roseville Electric load-calculation sheets, the HOA submittal formats in each community, and the Placer County building codes that govern unincorporated pockets near the city line. The studio has designed, permitted, and built 900+ ADUs, every one with a written price before work began and a documented photo record when work was complete.

That’s not a sales promise; it’s how the studio’s QA process works.

Our New Detached ADU Services in Roseville

The exact ADU type that fits your Roseville lot depends on setbacks, HOA design guidelines, and how your existing home is oriented. Here’s how we approach the four most common paths for a New Detached ADU in Roseville.

Custom Built ADU

A custom detached ADU in Roseville usually lands between $260,000 and $380,000 for a one-bedroom or two-bedroom design, including site work, utilities, and all permits. On a 7,000 sq ft lot in Westpark or Woodcreek, a custom build lets you place the ADU to preserve the backyard’s usable space. We document every step: the permit set with Roseville Electric load calcs, the HOA approval letter, the framing inspection photos, and the final Title 24 commissioning report. Because the studio carries both the design and the construction in one contract, the person who draws the roof pitch is the same team accountable for building it.

1-Bed & 2-Bed ADU

In Roseville, a one-bedroom detached ADU of about 500-600 sq ft typically runs $220,000-$280,000. A two-bedroom of 800-1,000 sq ft runs $300,000-$380,000. The addition of a second bedroom changes the parking review, the Title 24 energy model, and sometimes the HOA’s floor-area ratio calculations. We’ll show you the dollar line items for each before you choose.

Prefab ADU Installation

We specify and coordinate prefab systems from Abodu, Cover, and Dvele inside the same single contract we use for stick-built work. A prefab detached ADU in Roseville can run $250,000-$340,000 depending on the manufacturer, the crane access, and the foundation scope. One caution specific to Roseville: many HOAs want the exterior siding and window trim to match the primary home’s stucco or board-and-batten profile. We coordinate those finish packages with the prefab manufacturer before the factory locks the panel schedule.

Two construction workers installing a wooden frame for a new ADU in Roseville, CA

Studio ADU

A studio detached ADU of 350-450 sq ft in Roseville typically runs $200,000-$260,000. These fit well on the 6,000 sq ft lots common in older communities like Sun City Roseville or the homes along Foothills Boulevard. The compact footprint helps with setback compliance, but the HOA still reviews the roofline and the exterior materials before the city sees the application.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

Trusted Brands We Service in Roseville

We work steadily with James Hardie, Abodu, and Dvele in Roseville. Hardie Artisan lap siding and vertical panel products show up on most of our custom Roseville ADUs because the HOAs here accept them readily and the material handles Roseville’s dry summer heat without the cracking you see in lesser fiber cement. For prefab and modular ADUs, we coordinate Abodu and Dvele systems through our permit process, matching the factory’s engineering package to Roseville Electric’s load requirements and the HOA’s exterior finish rules.

Common New Detached ADU Problems We See in Roseville Homes

  • HOA review filed after the city application. The city won’t accept a detached ADU permit in HOA-governed communities like Woodcreek or Stanford Ranch without the architectural committee’s sign-off. Filing the city application first gets a rejection; sequencing it correctly saves four to six weeks.
  • PG&E forms used for Roseville Electric. Contractors who pull permits across Placer and Sacramento Counties often submit PG&E load-calculation or interconnection forms. Roseville Electric rejects those outright. The correction cycle adds three to six weeks to the electrical permit.
  • Roof pitch and wall height failing HOA design guidelines. A detached ADU framed at an 8:12 pitch in a neighborhood whose design guidelines call for 6:12 gets a stop-work and a redesign. Most Roseville HOAs specify maximum building height, roof pitch, and exterior materials in their CC&Rs.
  • Slab curling in summer heat. Roseville regularly sees 100°F+ stretches. A concrete slab poured without a proper vapor barrier and without controlling moisture loss during curing can curl at the edges. That telegraphs into the framing and the flooring. We pour to a written slab specification and document the cure.

Pricing for New Detached ADU in Roseville, CA

A new detached ADU in Roseville runs roughly $200,000-$380,000, with the spread driven by square footage, site conditions, HOA finish requirements, and whether you choose custom stick-built or a prefab system from Abodu, Cover, or Dvele. A 400 sq ft studio starts near the bottom of that range; a two-bedroom Custom Built ADU sits near the top. For a detached ADU in the master-planned neighborhoods east of Highway 65, expect the HOA architectural review to add no cost, but two to six weeks to the calendar. The larger variables are utility trenching depth, foundation type (slab versus raised), and whether your electrical service needs a panel upgrade or a separate Roseville Electric meter. Every Ellery ADU Studio project gets a written line-item price before work starts, per Haven Standard Clause 1, and the scope is locked at signing. No door-side upsells. Call (971) 497-2402 to request a written estimate for your lot.

We Also Serve Cities Near Roseville

The local pros serve Roseville and the surrounding communities including Citrus Heights, Orangevale, Rocklin, and Fair Oaks. If your property sits within a few miles of the Roseville city line, the same design-build contract, the same written price guarantee, and the same documented photo record apply. We schedule Roseville work from our Sacramento metro office, but the crews who build your ADU are local to the area and know the Roseville Electric and HOA tracks firsthand.

Serving Roseville, CA - Our Local Coverage Area

We’re serving the Roseville area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Roseville

The living room inside a new ADU

Why Roseville Chooses Ellery ADU Studio

We set the standard for new detached ADU in Roseville.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Roseville

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Roseville Customers Say

Trusted by homeowners across Roseville and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N.

More ADU services in Roseville

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Roseville?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Roseville.

(971) 497-2402

Request a Free Estimate in Roseville

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Areas We Serve
Call Now - 24/7 Dispatch