Ellery ADU Studio adu team

Garage Conversion ADU in West Palm Beach - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in West Palm Beach, FL

An ADU in West Palm Beach is most commonly a garage conversion, a detached new build, or a legalized 1920s-era “mother-in-law” suite, and the job always starts with a permit set that clears the city’s historic-district and flood-zone rules. What makes West Palm Beach different from almost anywhere else in Florida is the combination of older CBS homes, FEMA flood maps, and the Palm Beach-adjacent workforce housing market that makes a well-built ADU a real income asset. We quote every project with a written price before any work starts, per Haven Standard Clause 1, and the design, drawings, and construction are one contract. Call (971) 497-2402 for a free estimate.

Call (971) 497-2402

Why West Palm Beach Homes Are Different

West Palm Beach sits directly across the Intracoastal from Palm Beach island, one of the wealthiest zip codes in America, and that adjacency drives ADU demand in a way you won’t find in Orlando or Fort Lauderdale. Domestic workers, groundskeepers, and service staff who power the estate economy across the bridge have been priced out of West Palm Beach rents, so homeowners in neighborhoods like Flamingo Park, El Cid, and Northwood are building ADUs as workforce housing and long-term rental income. The housing stock makes this work distinctive: most of those older neighborhoods are dense with 1920s to 1940s Mediterranean Revival and Mission-style CBS homes on modest lots, many of which already have detached garages or informal “mother-in-law quarters” built before modern ADU codes existed. Converting or legalizing those structures is a major share of local ADU work.

The building conditions are just as specific. Much of the city sits in FEMA Special Flood Hazard Areas tied to the Intracoastal and the flat South Florida water table, so detached ADUs frequently require engineered stem-wall or pile foundations to meet minimum base flood elevation. That’s a line item that surprises homeowners who assume slab-on-grade. On top of that, Florida Building Code’s High-Velocity Hurricane Zone requirements apply to every new ADU: impact-rated windows, roof-to-wall strapping, and 170-mph wind design. The per-square-foot cost here runs higher than inland states for reasons that have nothing to do with labor and everything to do with wind and water.

Our Main West Palm Beach Services

Most West Palm Beach homeowners first call us about one of two projects: converting an existing garage into a rentable unit, or building a new detached ADU in the backyard. Here’s what each job involves locally.

Garage Conversion ADU in West Palm Beach

In Flamingo Park, El Cid, and Northwood, many detached garages are original 1920s-to-1940s CBS structures, and converting one means working with an existing footprint that already clears much of the setback puzzle. The challenge is the slab: older garages were often poured without modern vapor barriers or flood-zone consideration, and many need structural tie-downs and a new stem-wall detail before interior framing can begin. We handle the design, the permit set, and the construction as one contract, so the person who draws the conversion is the same team that builds it. See Garage Conversion ADU in West Palm Beach for the full scope, local pricing, and permit specifics.

Garage Conversion ADU in West Palm Beach

New Detached ADU in West Palm Beach

A new detached ADU on a mid-century CBS ranch lot, typically 50 by 100 feet through the central and northern corridors, starts with setback compliance and a foundation design based on the FEMA flood map for your specific parcel. High-Velocity Hurricane Zone detailing governs the roof framing, window selection, and wall strapping, so the dollars you spend on the shell are protecting the rent you’ll collect later. We specify prefab systems from brands like Abodu and Cover where the site allows, or stick-built designs where historic-district or lot-shape constraints require it. See New Detached ADU in West Palm Beach for a full West Palm Beach build breakdown.

New Detached ADU in West Palm Beach
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

ADU Design & Permitting in West Palm Beach

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
ADU Design & Permitting in West Palm Beach

ADU Design & Permitting in West Palm Beach is where projects either get built or stall for six months. The permit set is the product: a complete drawing package that answers the building department’s flood-zone, hurricane-zone, and historic-district questions before they’re asked. In El Cid and Flamingo Park, a garage conversion that would sail through in Lake Worth Beach can sit for months waiting on a Certificate of Appropriateness from the Historic Preservation Board, because the roofline, fenestration, and exterior materials all have to read as compatible with Mediterranean Revival character. We produce elevation drawings and code analysis for exactly that review, and we quote the whole design and permitting phase with a written price before any work starts. That’s the ADU Design & Permitting practice under one contract, drawings through final inspection.

Site Assessment

Signs you need it

You’re looking at a detached garage, an old carport, or a side yard and can’t tell whether the lot can legally hold an ADU.

What it costs in West Palm Beach

A site assessment in West Palm Beach typically runs $450-$2,500 depending on whether survey work, soil testing, or an engineer’s flood-zone letter is required.

How we do it

We pull the county parcel data, the FEMA flood panel, the zoning district rules, and the HOA or historic-district overlay, then walk the lot with a measuring crew and a structural engineer when the slab condition matters.

ADU Design & Blueprints

Signs you need it

Your ADU will need to pass the Historic Preservation Board or a floodplain review, and a hand sketch won’t get through either one.

What it costs in West Palm Beach

A full ADU design and blueprint set in West Palm Beach typically runs $4,000-$15,000 depending on whether you’re converting an existing structure or drawing a new detached unit from scratch.

How we do it

We draft the architectural set, the structural pages, the energy compliance documents, and the flood-elevation details, then run a code-consultant review before the package ever reaches the city counter.

Permit Application

Signs you need it

You’ve heard that West Palm Beach permit review runs slow, especially in historic districts, and you want a package that clears the first submission.

What it costs in West Palm Beach

Permit application and management in West Palm Beach typically runs $2,500-$8,000 on top of city fees, depending on how many review boards your parcel triggers.

How we do it

We file the drawings, track every comment from the building department and any historic-preservation reviewer, revise the set, and walk the permit through final issuance.

What ADU Design & Permitting Costs in West Palm Beach

Item Typical range in West Palm Beach
Site assessment $450-$2,500
Design & blueprints $4,000-$15,000
Permit application & management $2,500-$8,000

Will I need a Certificate of Appropriateness for my ADU?

If your property sits within Flamingo Park, El Cid, Northwood, or another locally designated historic district, yes. The Historic Preservation Board reviews the roofline, window pattern, and exterior materials before the building department will issue permits. Our drawings are prepared specifically for that review. Call (971) 497-2402 for a written price on your design package.

How long does ADU permitting take in West Palm Beach?

For a garage conversion outside a historic district, the first permit review often returns comments within 30 to 60 days. Inside a historic district, expect the Certificate of Appropriateness process to add several months before drawings even reach the building department. Our fee includes managing both tracks. Call (971) 497-2402 for an exact scope on your lot.

Junior ADU & Interior Conversion in West Palm Beach

Technician installing HVAC system during a professional garage conversion ADU project
Junior ADU & Interior Conversion in West Palm Beach

A Junior ADU in West Palm Beach is usually carved out of an existing home: an attached garage, a master suite, or a closed-off wing that gets its own entrance, kitchenette, and bathroom. The city’s older 1920s-1940s CBS homes in Flamingo Park and El Cid often have original maid’s quarters or attached service rooms that were never legalized, and converting them to a JADU is frequently faster and cheaper than building new. This is where interior conversions make the most sense, and the permit path is often shorter than a detached build. That’s the work we do under Junior ADU & Interior Conversion, one contract at one written price.

Room-to-ADU Conversion

Signs you need it

Your 1940s CBS home has an attached maid’s room or service wing with a separate exterior door, and you want it to produce rent legally.

What it costs in West Palm Beach

A room-to-ADU conversion in West Palm Beach typically runs $60,000-$110,000 all-in, drawings through final inspection.

How we do it

We design the separating walls, the new kitchenette and bath, the egress, and the electrical subpanel, then file the permit set and build it out under one contract.

Attached Addition ADU

Signs you need it

Your lot is too tight for a detached unit, but you have a side yard or rear bump-out space where an attached ADU could work.

What it costs in West Palm Beach

An attached addition ADU in West Palm Beach typically runs $160,000-$300,000 depending on whether you need a stem-wall foundation and impact-rated shell upgrades.

How we do it

We design the addition to read as part of the existing house, run the foundation through the flood-zone requirements, and manage the High-Velocity Hurricane Zone shell details through to final inspection.

What Junior ADU & Interior Conversion Costs in West Palm Beach

Item Typical range in West Palm Beach
Room-to-ADU conversion $60,000-$110,000
Attached addition ADU $160,000-$300,000
Interior JADU (shared walls) $25,000-$55,000

Can I convert an attached garage into a Junior ADU in West Palm Beach?

Yes, if the attached garage is within the existing home footprint and you keep the exterior walls mostly intact. The kitchenette and bath trigger the permit, and the FEMA flood map still governs any ground-floor work. Call (971) 497-2402 for a written price on your specific floor plan.

Does a Junior ADU need its own entrance in West Palm Beach?

Yes. A JADU in West Palm Beach needs a separate exterior door, usually from the existing attached garage or a side wall. We detail that egress in the permit set so it passes on the first review. Call (971) 497-2402 for an exact quote on your conversion.

Get the price in writing before anything starts.Serving West Palm Beach - a real person answers, day or night.
Call now

ADU Site Prep & Utilities in West Palm Beach

Architect sketching custom ADU floor plan on grid paper for permitting
ADU Site Prep & Utilities in West Palm Beach

ADU Site Prep & Utilities in West Palm Beach is the phase that makes or breaks the schedule, because the flat water table and FEMA flood maps govern everything below grade. A detached ADU in most of the city needs a stem-wall or pile foundation elevated to meet minimum base flood elevation, and that’s before we touch electrical, water, or sewer. Older CBS homes in Flamingo Park and El Cid often have undersized panels and original cast iron plumbing laterals that can’t handle a second unit, so utility work here is regularly a full panel swap and a lateral replacement. We handle all of it under ADU Site Prep & Utilities in the same contract as the design, which means the person who sized the panel is the person who installs it.

Foundation & Grading

Signs you need it

Your parcel sits in a FEMA Special Flood Hazard Area, or the existing garage slab sits low enough that water pools at the door during a summer storm.

What it costs in West Palm Beach

A stem-wall or pile foundation in West Palm Beach typically runs $20,000-$60,000 depending on how high the flood plain pushes your base elevation and what the soil boring shows.

How we do it

We cut fill or drive piles per the engineer’s flood-zone letter, form the stem wall, pour the elevated slab, and grade the site so stormwater moves away from the finished ADU.

Electrical Panel Upgrade

Signs you need it

Your 1940s-era home still runs a 60-amp or 100-amp panel, and the load calculation for an ADU with a kitchenette, AC, and laundry exceeds the existing service.

What it costs in West Palm Beach

A panel upgrade and ADU sub-feed in West Palm Beach typically runs $4,000-$12,000 depending on service size and whether the utility lateral must be replaced.

How we do it

We run the load calculation, swap the main panel, pull the sub-feed to the ADU, and bond everything to the existing grounding system per current code.

Plumbing Lateral

Signs you need it

Your home still uses the original clay or cast-iron lateral, and an inspection camera shows bellies or root intrusion where the ADU will tie in.

What it costs in West Palm Beach

A lateral replacement from the house to the street main in West Palm Beach typically runs $6,000-$22,000 depending on depth, length, and whether the sidewalk must be cut.

How we do it

We run a camera inspection, replace the lateral with proper bedding and fall, and tie the new ADU line into the cleanout and main.

What ADU Site Prep & Utilities Costs in West Palm Beach

Item Typical range in West Palm Beach
Foundation & grading $20,000-$60,000
Electrical panel upgrade & sub-feed $4,000-$12,000
Plumbing lateral replacement $6,000-$22,000

Do I need a flood elevation certificate before site prep starts?

In most of West Palm Beach, yes. The FEMA flood map for your parcel determines the minimum base flood elevation, and the foundation design follows that certificate. We pull the flood panel as part of the site assessment, not after the design is done. Call (971) 497-2402 for a written price on your site prep scope.

Will the city require a new sewer lateral for my ADU?

Usually, if the existing lateral is original 1920s-to-1940s clay or cast iron. West Palm Beach’s building department wants a camera inspection before the ADU tie-in permit is issued, and belly or root issues trigger a replacement. Our price includes that inspection and the replacement if it’s needed. Call (971) 497-2402 for an exact quote.

Brands We Service in West Palm Beach

Architect sketching an ADU floor plan for design and permitting
Brands We Service in West Palm Beach

We specify and coordinate prefab and modular ADU systems from Abodu, Cover, Dvele, and Mighty Buildings within the same single contract. When we use their systems, the factory manages the shell, and our West Palm Beach crews handle the foundation, utilities, and finish work locally. See our brands for the full list and what each system handles well in a flood-zone lot.

Pricing for ADU in West Palm Beach, FL

Service Typical range in West Palm Beach
Site assessment $450-$2,500
ADU design & blueprints $4,000-$15,000
Permit application & management $2,500-$8,000
Room-to-ADU conversion $60,000-$110,000
Interior JADU (shared walls) $25,000-$55,000
Attached addition ADU $160,000-$300,000
Foundation & grading $20,000-$60,000
Electrical panel upgrade & sub-feed $4,000-$12,000
Plumbing lateral replacement $6,000-$22,000

Two things push ADU pricing up in West Palm Beach more than anywhere else: FEMA flood-zone foundation requirements and High-Velocity Hurricane Zone shell detailing. Every dollar you spend on those line items is quantifiable in the permit set, and every project we price comes with a written quote before work begins, per Haven Standard Clause 1.

Neighborhoods We Serve in West Palm Beach

Contractor spraying sealant during professional garage conversion into an ADU.
Neighborhoods We Serve in West Palm Beach

We work across West Palm Beach, from the historic districts to the mid-century ranch corridors. Our crews and inspectors cover the whole city daily.

  • Flamingo Park
  • El Cid
  • Northwood
  • Prospect Park
  • Southland Park

We’re typically on a West Palm Beach site within a few business days when a written estimate has been accepted, and same-week site visits are common for design-phase work.

Service Area - Cities Near West Palm Beach

We also work in the neighboring communities where the same flood-zone and hurricane-zone rules apply, and where the same housing stock creates the same ADU opportunities. See our city pages for Palm Beach Gardens, FL, Wellington, FL, Lake Worth, FL, and Boynton Beach, FL for the conditions specific to each area.

Serving West Palm Beach, FL - Our Local Coverage Area

Professional contractor applying spray foam insulation during a garage conversion project
Serving West Palm Beach, FL - Our Local Coverage Area

We’re based in the West Palm Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in West Palm Beach

Ready to get started? Free estimates · Written quotes before work starts response in West Palm Beach
Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What West Palm Beach Customers Say

★★★★★ 4.8 from 6+ reviews

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

- Mireille T.

How It Works in West Palm Beach

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in West Palm Beach - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in West Palm Beach - we'll get back to you fast. No obligation.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Call Now - Fast Dispatch
Areas We Serve
Call Now - Fast Dispatch