A garage converted into a bright studio apartment
Garage Conversion ADU · Burlingame, CA

Garage Conversion ADU in Burlingame - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
A kitchenette inside a converted garage
A new bathroom inside a converted garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The sitting area and efficiency kitchen of a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Garage Conversion ADU Across Burlingame

A garage conversion ADU in Burlingame typically runs $185,000-$260,000 all-in, drawings through final inspection, depending on whether you convert an attached or detached garage and what foundation work your lot triggers. That price range reflects the city’s tree-protection requirements, the 1920s-1950s housing stock, and the marine-layer climate that demands materials you wouldn’t spec in San Mateo or San Bruno. We coordinate every Burlingame project from the Bay Area, and a live person answers at (971) 497-2402 whenever you call.

Contractor spraying sealant during professional garage conversion into an ADU. in Burlingame, CA

Call (971) 497-2402

Most Burlingame homeowners we talk to are weighing the same question: convert the garage or build new? West of El Camino Real, where the lots run 50×100 and the trees are protected, conversion usually wins. It’s faster, it’s less disruptive to the yard, and it avoids the setback fights that come with a new detached structure on a small lot. But it’s not a drywall-and-paint job, not here. The foundation, the lateral, the panel, the window frames, the fasteners: every line item in Burlingame has a local reason behind it. We’ll walk through those reasons below, with numbers.

Why Burlingame Garage Conversions Need a Different Specification

A bedroom and desk inside a converted garage

The salt air here doesn’t just age buildings. It picks specific materials and destroys them on a timeline. Untreated mild-steel window frames corrode within two winters in Burlingame. Zinc-plated roofing fasteners on a composition shingle retrofit lose their coating within four to five years, and then water finds the garage-to-house tie-in. Open-joint pavers around the entry trap leaf litter from protected trees, and without sealed joints the base erodes within one rainy season, cracking the slab perimeter.

We see this on nearly every older Burlingame garage we open up. The fix is not mysterious: hot-dip galvanized or stainless hardware, marine-grade window frames, sealed paver joints, and a positive drainage detail under the slab. That spec costs more. We’re transparent about that gap because the cheap version costs more within a decade. A Burlingame garage ADU built with inland-spec materials will need window replacement and tie-in repairs around year six or seven. The coastal spec adds roughly $4,800-$7,200 to the whole project, depending on window count and paver area. It’s the difference between a shell that holds for 30 years and one that rusts out while the paint still looks new.

Burlingame’s Tree Ordinance Changes the Foundation, Not Just the Landscaping

Burlingame’s identity as the City of Trees is not branding. It’s a permitting reality that reshapes garage conversion ADUs here more than in any adjacent Peninsula city. The municipal tree protection ordinance requires arborist review and often a formal tree protection plan whenever foundation excavation or utility trenching falls within a protected tree’s root zone. And virtually every pre-1960 bungalow lot in the flats west of El Camino Real is canopied by mature oaks, redwoods, or sycamores that trigger exactly that review. Contractors from San Jose or the East Bay don’t anticipate this. Our Garage Conversion ADU team plans for it from the first site walk.

On a 1928 Craftsman bungalow lot off Burlingame Avenue west of El Camino Real, the local pro converted a detached single-car garage that sat within the drip line of a 40-inch coast live oak. The city required a tree protection plan before we could trench for a new 200A service lateral. So we specified hot-dip galvanized steel posts for the pier-and-beam foundation, stainless-steel fasteners at every ledger connection, and a fully sealed paver joint system for the path. Those choices cost roughly $4,800 more than our inland spec. They were non-negotiable, and they’re the difference between a foundation that respects the oak’s root zone and one that fails inspection or, worse, kills a protected tree and triggers fines.

This is the core reason we default to pier-and-grade-beam or post-and-pier foundations on detached Burlingame garage conversions rather than a standard slab. The tree roots are the variable, and the building counter here is known for catching utility trench routes that cross root protection zones of protected street trees. Early arborist coordination is practically a first step before we finalize any backyard ADU site plan in the flat, canopied neighborhoods east of the 101 and west of El Camino Real.

Garage Conversion ADU Services We Handle in Burlingame

Detached Garage Conversion

Most Burlingame homes built between 1920 and 1955 have original detached one-car garages at the rear of the lot, accessed by a narrow driveway. Converting one into an ADU usually means upgrading from a 100A to a 200A main panel, replacing the cast-iron lateral, and adding a cripple-wall seismic retrofit that folds into the ADU permit. We handle all of it under one contract at one written price, so the engineer’s drawings, the arborist’s tree plan, and the construction schedule all come from the same desk.

Attached Garage Conversion

Attached garage conversions in Burlingame tend to appear on the 1950s ranch homes east of El Camino Real, where the garage shares a wall with the house and the lot is slightly larger. The shared-wall detail matters here: you need a proper fire-rated assembly, and in Burlingame’s humidity you also need an air and moisture barrier that doesn’t trap condensation inside the wall cavity. We specify a ventilated rainscreen behind the cladding on the garage face, which is over-spec for dry inland cities but necessary in the persistent marine layer that sits over Burlingame most of the year.

Garage JADU

A Junior ADU carved out of an existing attached garage is the most cost-controlled path in Burlingame: under state law, a JADU can be up to 500 square feet, and it doesn’t require a separate sewer lateral when tied to the existing home’s system. The catch is that many older Burlingame homes still run cast-iron laterals under the slab, and once you open the floor to run new kitchen and bath lines, the city may flag the old pipe. We include lateral inspection in every JADU quote and fold replacement into the written scope when needed, no side conversation.

Professional contractor applying spray foam insulation during a garage conversion project in Burlingame, CA

Garage Partition & Bathroom Add

Some Burlingame homeowners don’t want a full dwelling. They want a home office, a guest suite, or a studio with a half bath carved out of the existing garage. This still triggers the same tree review if we’re moving plumbing or adding a foundation pier. The difference is speed: a partition and bathroom add can often be permitted and built in three to four months, where a full ADU with kitchen runs five to seven. And because the price is locked before work starts under the Haven Standard’s written-price clause, you’ll know where the money goes before we touch the slab.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

Prefab and Modular Systems We Coordinate in Burlingame

For homeowners who want a faster shell, we specify and coordinate prefab and modular systems from Cover, Dvele, and Boxabl within the same single contract. These systems arrive as engineered panels or modules, and the Burlingame-specific work happens at the foundation and utility level: the pier layout that avoids protected tree roots, the stainless tie-down hardware rated for marine air, and the lateral upgrade from the old cast-iron line. We stock the relevant hardware locally for Burlingame customers, so we’re not waiting on zinc-coated fasteners that would be wrong here anyway.

Common Burlingame-Specific Problems We See in Garage ADU Projects

  • Zinc-plated roofing fasteners on composition shingle retrofits. In Burlingame’s salt-laden marine air, the coating degrades within four to five years. Water enters at the garage-to-house tie-in, and by the time you see the stain on the ceiling, the sheathing is already compromised. We specify hot-dip galvanized or stainless fasteners on every reroof.
  • Untreated mild-steel window frames. A garage ADU with standard aluminum or cheap steel frames looks fine for two winters, then the corners start to bubble and pit. We spec marine-grade aluminum or vinyl frames with stainless hardware on every Burlingame garage conversion, and we itemize the cost difference on the written quote.
  • Open-joint pavers around the entry. Burlingame’s protected street trees drop heavy leaf litter each fall. Open-joint pavers trap that litter, hold moisture, and the base erodes within one rainy season. The slab perimeter cracks, and then you’re paying for a paver reset plus a foundation inspection. We seal the joints and install a positive drainage layer under the paver bed to keep water moving away from the slab.
  • 100A to 200A panel upgrades on the original bungalow stock. Most 1920s-1950s Burlingame homes still carry a 100A main panel, sometimes with a subpanel feeding the garage. An ADU with a kitchen and bathroom pulls more than that panel can safely deliver, and the city will not sign off on the final until the upgrade is permitted. We fold the panel upgrade into the conversion quote, so it’s not a surprise line item at rough-in.

Pricing for a Garage Conversion ADU in Burlingame, CA

Here are the ranges we see for Burlingame right now, all-in with drawings, permits, and construction under one contract:

  • Detached garage conversion: $195,000-$260,000, depending on foundation type and whether the tree ordinance triggers pier-and-grade-beam design.
  • Attached garage conversion: $185,000-$240,000, with the shared-wall fire assembly and rainscreen cladding as the main cost variables.
  • Garage JADU: $95,000-$145,000, assuming the existing lateral passes inspection and the panel upgrade isn’t deeper than 200A.
  • Garage partition and bathroom add: $55,000-$95,000, depending on the plumbing run and whether the city requires lateral replacement.

These numbers come from actual Burlingame projects we’ve completed and quoted in the last two years. The coastal materials spec (stainless fasteners, marine-grade window frames, sealed paver joints, vapor barrier under slab) adds $4,800-$7,200 over what an inland builder would charge, and it’s the right money to spend. A cheap spec in Burlingame costs more within a decade, every time. Every quote we write includes a line item for the coastal materials and the arborist coordination if applicable. The price is written before work starts, per Haven Standard Clause 1, and it doesn’t change unless you change the scope. Call (971) 497-2402 to schedule your free estimate.

Key Takeaways for Burlingame Homeowners

  • Garage conversion ADUs in Burlingame run $185,000-$260,000 all-in, with the tree ordinance and coastal materials as the two local cost drivers.
  • The City of Trees means protected oaks, redwoods, and sycamores on most pre-1960 lots trigger arborist review and often pier-and-grade-beam foundations.
  • Salt air kills zinc-plated fasteners and mild-steel window frames within five years. We spec hot-dip galvanized or stainless hardware and marine-grade frames on every project.
  • Most original Burlingame garages need a 100A to 200A panel upgrade, cast-iron lateral replacement, and seismic retrofit folded into the ADU permit.
  • Every project is designed, permitted, and built under one contract at one written price, with a Done Right Promise in writing.

We Also Serve Cities Near Burlingame

The local pros handle garage conversion ADU projects across the upper Peninsula, including Burlingame, San Mateo, San Bruno, Belmont, and South San Francisco. Each city has its own building counter quirks, but Burlingame’s tree ordinance is the one that reshapes foundations most often. We coordinate every job from the Bay Area and serve all of Burlingame locally. Call (971) 497-2402 for a written quote on your garage conversion.

Serving Burlingame, CA - Our Local Coverage Area

We’re serving the Burlingame area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Garage Conversion ADU in Burlingame

An attached garage converted into living space

Why Burlingame Chooses Ellery ADU Studio

We set the standard for garage conversion ADU in Burlingame.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Burlingame

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Burlingame Customers Say

Trusted by homeowners across Burlingame and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N.

More ADU services in Burlingame

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for Garage Conversion ADU in Burlingame?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Burlingame.

(971) 497-2402

Request a Free Estimate in Burlingame

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Areas We Serve
Call Now - 24/7 Dispatch