A new modern detached ADU in a backyard
New Detached ADU · Fremont, CA

New Detached ADU in Fremont - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
The living room inside a new ADU
A new two-story ADU over a garage
A compact kitchen inside a new ADU
A new modern ADU with wood cladding
The bedroom inside a new ADU
The sitting area and efficiency kitchen of a junior ADU
A bedroom and desk inside a converted garage
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable New Detached ADU Across Fremont

If you’re planning a new detached ADU in Fremont, the single most important decision you’ll make won’t be the floor plan. It’ll be the materials spec, and whether it’s matched to your actual lot conditions. On bayside lots in Warm Springs and Centerville, we routinely open up ADUs built less than six years ago and find rusted roofing fasteners, rotted fence posts, and corroded window trim. The repair bill for that corrosion damage lands around $15,000 on a typical 700 sq ft ADU. Our New Detached ADU team documents every material decision in writing before work starts, so you don’t pay for the inland-spec mistake twice. Call (971) 497-2402 to schedule your free estimate.

Workers installing steel structural framing for a new detached ADU construction. in Fremont, CA

Call (971) 497-2402

Why Ellery ADU Studio Is Fremont’s Preferred New Detached ADU Company

The bathroom inside a new ADU

We’ve designed and permitted detached ADUs across Fremont’s distinct submarkets: the postwar ranch lots of Centerville, the hillside parcels of Mission San Jose, the South Asian-anchored neighborhoods of Irvington, and the BART-corridor communities of Warm Springs. Each area has its own foundation, fire-zone, and materials story, and we’ve learned them on the ground, not from a spreadsheet.

Fremont homeowners who work with us get one thing most other design-build studios don’t offer: a written price before any work begins, under Haven Standard Clause 1. That includes the permit set, the drawings, the construction, and the documented photo record on every visit. Our Fremont clients also get our Done Right Promise in writing: if the finished ADU isn’t built to the permitted drawings, we make it right. That discipline is exactly what a Fremont homeowner needs in a city with Alquist-Priolo fault-zone reviews, WUI fire overlays, and liquefaction mapping.

We answer calls with a live person, 24/7. Not a voicemail queue. When you call about a detached ADU in Fremont, you reach someone who can answer permit questions, talk lot conditions, and schedule your free estimate.

Our New Detached ADU Services in Fremont

Custom Built ADU

A custom built ADU in Fremont starts with zero design assumptions. We work from the lot’s actual conditions, measured on site, and from your household’s actual needs, documented in our pre-construction questionnaire. In Irvington and Mission San Jose, that questionnaire routinely surfaces Vastu Shastra orientation requirements: bedroom and kitchen walls aligned to specific compass directions, doors positioned to honor entry principles, and cooking zones placed apart from sleeping areas. We route these into the foundation layout phase, not the framing phase, so they don’t become change orders.

Custom ADUs in Fremont’s postwar ranch neighborhoods of Centerville and Warm Springs are typically built as 1,200 to 1,600 sq ft two-bedroom units on 5,500 to 8,500 sq ft lots. Expect a full plan-to-final-inspection timeline of 9 to 14 months, depending on the planning review queue and whether a setback variance, the extra distance the city requires between your new unit and the property line, is needed.

Prefab ADU Installation

Prefab and modular ADUs under brands like Abodu, Cover, and Dvele are increasingly common in Fremont’s tech-employed Warm Springs corridor. These units arrive as panelized or volumetric systems, and we coordinate their assembly and finishing within the same single contract that covers the site prep and the utility connections. The advantage for a Fremont homeowner is a shorter on-site construction window, sometimes as little as 8 to 12 weeks after the foundation cures. But the materials story still matters: bayside lots in Warm Springs and Centerville need the same coastal-spec fasteners, trim, and fencing as a stick-built ADU. We spec that from day one.

Modular ADU

Modular ADUs for Fremont’s flat-lot neighborhoods are a strong fit when the city’s permitting timeline is the bottleneck. Because the modules are fabricated off-site, the on-site work is compressed. But city approvals for the foundation, the utility trenching, and the fire-sprinkler and sewer connections still run through Fremont’s planning desk, and they still require the fire-zone reviews and geotechnical reports that come with Fremont’s Hayward Fault and WUI overlays. We prepare those permit packages ourselves, and we’ll tell you exactly what Fremont asks for before the first module is ordered. No surprises at the planning counter.

Studio ADU

A studio ADU in Fremont is the workhorse option for a rental unit or a home office, typically 450 to 700 sq ft with a full bath and a kitchenette. On a Warm Springs bayside lot, the materials spec is the same no matter the size: Type 316 stainless roofing fasteners, marine-grade aluminum window trim, hot-dip galvanized fence-post brackets on raised concrete piers, and sealed paver joints. Skip those on the coast side of the city and the corrosion clock starts ticking before the paint is dry.

Two construction workers installing a wooden frame for a new ADU in Fremont, CA

1-Bed & 2-Bed ADU

Fremont’s ADU pipeline tilts heavily toward 1-bed and 2-bed units, driven by the city’s multigenerational household norms. A 1-bed ADU in Irvington for a relocating parent is often built with Vastu-aligned orientation and permanent kitchen amenities, not a rental-grade kitchenette. A 2-bed ADU in Mission San Jose is commonly designed for extended family, with separate entrances and generous sound separation between the main house and the unit. We document all of this in writing and carry it through the permit set.

Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

Trusted Brands We Service in Fremont

We specify and coordinate prefab systems from Abodu, Cover, and Dvele within the same single contract. For Fremont’s bayside lots we lean on materials that hold up to salt-laden fog and wet winters: James Hardie siding performs well against marine moisture when installed with the right flashing details, and we stock stainless and hot-dip hardware for Fremont jobs specifically. When a panel arrives with a missing fastener or a trim piece that wasn’t in the kit, we have the local parts to finish the job without a two-week order delay.

Common New Detached ADU Problems We See in Fremont Homes

  • Rusted roofing fasteners on bayside lots. We opened a 2019 detached ADU in Warm Springs where the builder used electro-galvanized screws. Every third screw was rusting at the head within five years, leaving rust streaks on the shingles. Coastal-spec means Type 316 stainless, full stop.
  • Rotted fence and gate posts at grade. The summer marine layer that rolls in off the bay most mornings keeps soil damp along Bay Street and Thornton Ave corridors. Standard cedar posts set directly in concrete rot at grade. We set posts in hot-dip galvanized brackets on raised piers.
  • Utility panel and sewer lateral shortfalls. Most Fremont single-family homes date from 1958 to 1980, and many still run 100-amp panels and original clay sewer laterals. A new detached ADU typically requires a panel upgrade and a lateral replacement before the permit can close.
  • Mission San Jose hillside grading and fire-zone reviews. Homes on the hillside parcels built in the 1970s and 80s sit on steeper grades and within Hayward Fault-triggered Alquist-Priolo geotechnical review zones. Some also carry WUI fire-zone overlays requiring ignition-resistant exterior assemblies.

Pricing for New Detached ADU in Fremont, CA

A new detached ADU in Fremont typically runs $380 to $620 per square foot, all-in from drawings through final inspection. A 700 sq ft studio ADU on a standard Centerville lot usually lands between $265,000 and $435,000. A 1,200 sq ft two-bedroom ADU in Mission San Jose with hillside grading and a geotechnical report typically runs $455,000 to $745,000. Bayside lots in Warm Springs and bayside Centerville add roughly $18 per square foot for coastal-spec materials: stainless fasteners, marine-grade trim, sealed paver joints, and raised-pier fencing. That premium is cheaper than the corrosion repair bill you’ll otherwise pay within a decade. Every quote is a written price before any work starts, per Haven Standard Clause 1. Call (971) 497-2402 to schedule your free estimate.

We Also Serve Cities Near Fremont

The local pros serve the entire Fremont area, including Newark, Union City, Hayward, and Pleasanton. The permitting, the soil conditions, and the materials story differ from city to city, but the standard is the same: a written price first, a documented photo record on every visit, and a Done Right Promise in writing. If you’re in a neighboring city and want the same clarity on your new detached ADU, call (971) 497-2402.

Serving Fremont, CA - Our Local Coverage Area

We’re serving the Fremont area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Fremont

A small deck outside a new ADU

Why Fremont Chooses Ellery ADU Studio

We set the standard for new detached ADU in Fremont.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Fremont

Getting your new detached ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your new detached ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local new detached ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Fremont Customers Say

Trusted by homeowners across Fremont and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N.

More ADU services in Fremont

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Fremont?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Fremont.

(971) 497-2402

Request a Free Estimate in Fremont

Tell us about your new detached ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Areas We Serve
Call Now - 24/7 Dispatch