New Detached ADU in Hialeah, FL | Ellery ADU Studio

New Detached ADU in Hialeah - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

392+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable New Detached ADU Across Hialeah

A new detached ADU in Hialeah typically runs $210,000 to $340,000 all-in, from drawings through final inspection, depending on whether you build custom on-site or specify a prefab system like Abodu or Cover. We do the whole thing under one contract at one written price, which means the architectural drawings, the Miami-Dade permit set, and the construction are our responsibility, not three separate vendors pointing fingers. If you’re on a narrow lot near East 4th Avenue or out by West 68th Street and wondering whether your yard can even fit a detached unit, call (971) 497-2402 and we’ll tell you straight, with numbers, before you spend a dime.

Workers installing steel structural framing for a new detached ADU construction. in Hialeah, FL

Call (971) 497-2402

Why Ellery ADU Studio Is Hialeah’s Preferred New Detached ADU Company

Hialeah’s housing stock is different from the rest of South Florida. The city is a dense grid of CBS (concrete block) homes built between the early 1950s and late 1970s, most on lots 50 feet wide or less. That changes how a detached ADU gets designed, permitted, and built. You cannot copy a plan from a Kendall subdivision and drop it onto a 5,000-square-foot lot off Palm Avenue. We know that because we’ve done this work here, repeatedly, and we’ve learned what the city’s reviewers flag and what they pass without comment.

We’re a New Detached ADU design-build studio, not a contractor who hands you drawings from someone else and then blames the architect when the inspector finds a problem. Nadia Ellery founded this practice in 2015, and every project we take on starts with a written price under Haven Standard Clause 1. No call-for-a-quote games. No “we’ll see once we open the walls.” The number is on paper before you sign anything.

Hialeah customers get the same documented process: a photo record of every site visit, a permit set that a third-party reviewer could audit, and a 365-Day Done Right Promise in writing. If the finished ADU doesn’t match the permitted drawings, we fix it. That clause is in the contract, not a marketing line on a van.

Our New Detached ADU Services in Hialeah

construction workers installing trim on the exterior of a detached ADU
Our New Detached ADU Services in Hialeah

Custom Built ADU

A custom detached ADU lets you use every inch of a tight Hialeah lot. We design around your existing slab, your side setbacks, and the parking replacement requirement the city enforces, then build on-site. On a 50-foot lot near East 4th Avenue, we built a one-bedroom detached ADU for a family that had been illegally renting a converted carport. Our crew kept the site clean with flaggers and a single-truck staging plan, installed impact-rated windows to meet Miami-Dade’s 175+ mph wind-load code, and poured a replacement parking pad only after percolation tests confirmed the high water table wouldn’t undermine the slab.

Custom Built ADU

Prefab ADU Installation

Prefab works well in Hialeah when your lot access is constrained. We specify and coordinate systems from Abodu and Cover within the same single contract that covers your foundation, utility trenching, and Dade County permit compliance. Prefab doesn’t dodge the wind-load rules. Impact-rated openings are still mandatory, and we price them from day one, not as a surprise line item after you’ve emotionally committed to a floor plan.

Prefab ADU Installation

Modular ADU

Modular construction gives you factory-built precision with more layout flexibility than a fully prefab unit. Hialeah’s dense blocks mean crane access and staging need planning before the modules arrive. We coordinate that, along with off-street parking replacement and slab elevation. A two-bedroom modular ADU in Hialeah typically runs $290,000 to $360,000 all-in, impact-rated windows and permit fees included.

Modular ADU

Studio ADU

A studio detached ADU is the most common request we get from Hialeah homeowners who want a legal rental or space for an aging parent. Expect 400 to 600 square feet, a full bath and kitchenette, and a build range of $195,000 to $250,000 depending on foundation work and utility runs. On lots where the sewer lateral runs under the only buildable yard space, that trenching cost gets priced upfront, not discovered mid-dig.

Two construction workers installing a wooden frame for a new ADU in Hialeah, FL
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Hialeah

We specify and coordinate Abodu, Cover, Dvele, and Mighty Buildings systems for Hialeah projects, and we handle the foundation, utility, and wind-load compliance work that factory warranties do not cover. All of it stays inside the same written price and the same contract. We keep the process plain: one team, one scope, one set of drawings, one number.

Common New Detached ADU Problems We See in Hialeah Homes

Workers installing steel structural framing for a new detached ADU construction.
Common New Detached ADU Problems We See in Hialeah Homes
  • The parking replacement rule catches people off guard. Hialeah requires that any off-street parking lost to a new detached ADU be replaced on the same parcel. On a narrow, fully-paved lot, that often means engineering a new concrete pad in what little yard remains, and the cost goes into our quote from day one, not after demolition starts.
  • Impact-rated openings get ignored in the first bid. Miami-Dade’s post-Hurricane Andrew protocol requires impact-resistant windows and doors, rated for 175+ mph wind loads. We quote them from the start. A competitor who doesn’t will look cheaper on paper and then hand you a change order for $18,000 when the permit reviewer rejects the window schedule.
  • Slab elevation gets skipped. Hialeah’s water table sits high, and seasonal flooding is real. A ground-level ADU poured without proper elevation will show moisture intrusion within two wet seasons. We run percolation tests before we design the foundation, not after the inspector flags it.
  • A contractor blocks a neighbor’s driveway during staging. Dense streets don’t forgive bad logistics. A neighbor complaint to code enforcement can trigger a stop-work order. Our crews stage on-site where possible and coordinate flagging when the street is genuinely too tight.
Get the price in writing before anything starts.Serving Hialeah - a real person answers, day or night.
Call now

Pricing for New Detached ADU in Hialeah, FL

Here are the numbers we’re seeing in Hialeah, not generic Florida averages. A studio detached ADU runs $195,000 to $250,000. A one-bedroom custom unit lands between $230,000 and $310,000. A two-bedroom, whether modular or stick-built, sits at $290,000 to $360,000. Prefab systems from Abodu and Cover add coordination cost but can reduce site time, which matters when your yard doubles as your staging area. Every quote we write includes the Miami-Dade wind-load upgrades, the parking replacement pad, permit fees, and our photo record. You get one written price, and under Haven Standard Clause 5, the scope is locked at signing. No door-side upsells. Call (971) 497-2402 to schedule your free estimate.

We Also Serve Cities Near Hialeah

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
We Also Serve Cities Near Hialeah

Our crews serve Hialeah and the surrounding South Florida cities: Miami Gardens, Miami, North Miami Beach, and Miami Beach. Dispatch and scheduling are coordinated from our Miami (South FL) office, with local crews working Hialeah sites daily.

Serving Hialeah, FL - Our Local Coverage Area

We’re based in the Hialeah area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Hialeah

Two construction workers installing a wooden frame for a new ADU
FAQs - New Detached ADU in Hialeah

Why Hialeah Chooses Ellery ADU Studio

We set the standard for new detached adu in Hialeah.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Hialeah

Getting your new detached adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your new detached adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Hialeah - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local new detached adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Hialeah Customers Say

Trusted by homeowners across Hialeah and surrounding areas.

★★★★★

"Handled the whole planning process. We went to one hearing and that was it."

Rowena C. · Verified customer
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Hialeah?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Hialeah.

(971) 497-2402

Request a Free Estimate in Hialeah

Tell us about your new detached adu needs - we'll respond within the hour.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Areas We Serve
Call Now - Fast Dispatch