Garage Conversion ADU in Flower Mound, TX | Ellery ADU Studio

Garage Conversion ADU in Flower Mound - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

392+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable Garage Conversion ADU Across Flower Mound

A garage conversion ADU in Flower Mound typically runs $185,000 to $310,000 all-in, drawings through final inspection, depending on whether you’re converting an attached two-car garage or partitioning a larger garage into a JADU with a bathroom. The permit path here is genuinely different from what you’ll face in Lewisville or Grapevine, because Flower Mound layers HB 1154 state ADU rights on top of impervious cover limits, lot coverage caps, tree preservation rules, and active HOA architectural review committees that can veto a design the town already approved. We coordinate that entire sequence under one contract at one written price, so you’re not bouncing between a designer, a structural engineer, and a builder while a Wellington HOA board asks for revised elevations. Call (971) 497-2402 and we’ll walk you through what your specific property can actually support.

Contractor spraying sealant during professional garage conversion into an ADU. in Flower Mound, TX

Call (971) 497-2402

Why Ellery ADU Studio Is Flower Mound’s Preferred Garage Conversion ADU Company

We’ve designed, permitted, and built Garage Conversion ADU projects across Flower Mound’s master-planned subdivisions long enough to know which HOAs require architectural review packets before the town will even look at a permit application. That sequencing matters. A garage conversion in Wellington or Silverton that skips the HOA step can clear Building Inspections and still get a stop-work demand from the board two months later. We front-load that review, gather the elevation drawings and material samples the committee wants, and get written approval before we pull the permit. It adds a week or two. It also means the project doesn’t die halfway through.

Nadia Ellery founded this studio in 2015 around a simple observation: most ADU projects fail at the handoff between the person who draws the plans and the person who swings the hammer. Our answer is a single design-build contract. The pergola drawings, the structural calcs, the window schedule, the HOA submittal package, and the construction crew all sit under one agreement with one written price. Under Haven Standard Clause 5, the scope is locked at signing. No door-side upsells. No designer pointing at the builder and the builder pointing at the designer. For Flower Mound homeowners who bought between 2015 and 2022 and are now looking at an ADU as a long-term income or aging-in-place asset, that accountability is the whole game.

Our crews are background-checked and uniformed. The license number appears on every document you receive. And every visit includes a documented photo record, so you can see exactly what was found in your garage slab, your stem wall, your roof framing, and your utility stub-outs, not a summary of how it felt.

Our Garage Conversion ADU Services in Flower Mound

Technician installing HVAC system during a professional garage conversion ADU project
Our Garage Conversion ADU Services in Flower Mound

Attached Garage Conversion

Most Flower Mound homes we convert are 1990s to 2010s brick-veneer, slab-on-grade builds with attached two-car garages in the 400 to 480 square foot range. That footprint converts cleanly into a one-bedroom ADU with a kitchenette, but the original garage slab was never designed for a conditioned, finished space. On a Wellington project last year, the existing pad had already cracked from Blackland Prairie clay movement. We installed a James Hardie HardieBacker moisture barrier, reinforced the stem wall to meet Flower Mound’s wind-load requirements, and worked with the HOA’s architectural review committee on new window placement before pulling the town permit. A typical attached garage conversion in Flower Mound runs $185,000 to $260,000, with the foundation remediation line item driven by what the slab and soil report actually show.

Attached Garage Conversion

Detached Garage Conversion

Detached garage conversions carry more permitting weight in Flower Mound than attached work, because the town treats them as separate structures subject to setback reviews, impervious cover calculations, and the tree preservation ordinance. If your detached garage sits under a mature oak or pecan that the town won’t let you disturb, that changes the foundation and drainage plan before a single wall goes up. We specify and coordinate prefab systems from Cover, Abodu, and Dvele where the existing structure can’t be feasibly converted, always inside the same single contract. A detached garage conversion in Flower Mound typically runs $220,000 to $310,000.

Detached Garage Conversion

Garage Partition & Bathroom Add

This is the highest-value move for Flower Mound homeowners who don’t want to lose their entire garage. You partition off 200 to 300 square feet, add a full bath, and keep a single parking bay plus storage. The bathroom add is where our plumbing and site prep work matters most: many 1990s slab-on-grade homes in Flower Mound have sewer stub-outs on the far side of the house from the garage, which means trenching across the backyard or running a new lateral. We price that line item in writing before work starts. A garage partition with a bathroom add in Flower Mound runs $120,000 to $185,000.

Garage Partition & Bathroom Add

Garage JADU

A JADU carved out of an existing attached garage is the fastest permitted path in Flower Mound right now, especially under HB 1154, because the state law treats attached interior conversions more favorably than new detached structures. The catch this page exists to explain: your HOA may still require architectural review even when the town treats the project as over-the-counter. We prepare both submittal packages in parallel, so neither one becomes the bottleneck. A garage JADU in Flower Mound typically runs $95,000 to $150,000, depending on whether you need a kitchenette or just a wet bar and bath.

Garage JADU
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Flower Mound

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and Mighty Buildings within the same single contract we use for site-built work. For Flower Mound clients considering a prefab panelized system rather than a traditional stick-frame conversion, we handle the manufacturer coordination, the structural review, the HOA submittal, and the site prep. That’s the part most prefab companies don’t do: they deliver panels to the curb and leave you to figure out the foundation, the utility stubs, and the town’s impervious cover math. We own all of it. The written price covers the panel system, the foundation, the utility connections, and the finish work, because the whole point of our model is that nobody gets to point at a different company when something doesn’t meet spec.

Professional contractor applying spray foam insulation during a garage conversion project in Flower Mound, TX

Common Garage Conversion ADU Problems We See in Flower Mound Homes

Contractor spraying sealant during professional garage conversion into an ADU.
Common Garage Conversion ADU Problems We See in Flower Mound Homes
  • Slab cracks from Blackland Prairie clay movement. Flower Mound sits on expansive clay that swells in spring rains and shrinks in summer drought. A garage pad poured in 1998 was never intended to support a finished, conditioned space, and the wet-dry cycle opens cracks that telegraph through your new flooring within two years. We include a soil report and a stem wall reinforcement plan in every detached conversion quote.
  • Skipped HOA architectural review in Silverton or The Preserves. The town’s Building Inspections Department may approve your garage conversion under HB 1154, but an HOA board with its own architectural committee can still force a redesign or demand removal of unapproved window placement, door style, or exterior finish. We run the HOA submittal before the town permit so you never build something you can’t legally keep.
  • Unrated windows and doors that fail Flower Mound’s wind-load inspection. North Texas wind-load requirements here exceed those in many neighboring DFW suburbs. A cheap quote that omits tested window and door assemblies will red-tag at final inspection. Our written quotes name the specific wind-load rating every opening must meet, which products carry it, and the inspection sign-off that proves it.
  • Utility stub-outs that were never designed for a second dwelling. Flower Mound’s 0.25 to 1+ acre master-planned lots give you room for an ADU, but the original sewer, water, and electrical service were sized for one house. We map the existing stubs during the design phase, not after demolition, so the trenching and panel upgrade line items are in the written price from day one.
Get the price in writing before anything starts.Serving Flower Mound - a real person answers, day or night.
Call now

Pricing for Garage Conversion ADU in Flower Mound, TX

Here’s what Flower Mound homeowners should expect, based on the projects we’ve permitted and built in this market:

  • Garage JADU: $95,000 - $150,000
  • Garage partition with bathroom add: $120,000 - $185,000
  • Attached garage conversion: $185,000 - $260,000
  • Detached garage conversion: $220,000 - $310,000

Every range above is a written price, not an estimate you call to confirm. What moves you within a range: the soil report findings, the HOA’s required elevation changes, whether your home sits in a FEMA-mapped flood zone near the Grapevine Lake or Elm Fork corridors (which triggers an elevation certificate before the town will issue permits), and the wind-load rating your window and door assemblies have to meet. We deliver the full line-item quote in writing before work starts, per Haven Standard Clause 1. Call (971) 497-2402 and we’ll schedule the site walk and slab inspection that produces your number.

We Also Serve Cities Near Flower Mound

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
We Also Serve Cities Near Flower Mound

Our crews serve Flower Mound and the surrounding North Texas suburbs, including Southlake, Grapevine, Lewisville, and Coppell. Each has its own permitting quirks, HOA landscape, and soil behavior, and we’ve worked enough jobs in each to know which one wants the architectural review before the permit and which one wants it after. Dispatch and scheduling are coordinated from the brand’s Dallas-Fort Worth office, with local crews serving Flower Mound directly.

Serving Flower Mound, TX - Our Local Coverage Area

We’re based in the Flower Mound area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Garage Conversion ADU in Flower Mound

Professional contractor applying spray foam insulation during a garage conversion project
FAQs - Garage Conversion ADU in Flower Mound

Why Flower Mound Chooses Ellery ADU Studio

We set the standard for garage conversion adu in Flower Mound.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Flower Mound

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Flower Mound - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local garage conversion adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Flower Mound Customers Say

Trusted by homeowners across Flower Mound and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for Garage Conversion ADU in Flower Mound?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Flower Mound.

(971) 497-2402

Request a Free Estimate in Flower Mound

Tell us about your garage conversion adu needs - we'll respond within the hour.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Areas We Serve
Call Now - Fast Dispatch