A garage converted into a bright studio apartment
Garage Conversion ADU · Keller, TX

Garage Conversion ADU in Keller - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

Work is performed by our local vetted partner.

Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
A former garage converted into a guest house
A bedroom and desk inside a converted garage
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
An efficiency kitchen in a junior ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

Fast, Reliable Garage Conversion ADU Across Keller

A garage conversion ADU in Keller typically runs $180,000-$320,000 all-in, drawings through final inspection, depending on whether you’re converting an attached garage, a bonus room above a three-car garage, or building a detached unit from the slab up. Most Keller projects take 4-7 months, and the single biggest variable is what’s hiding inside walls built in the 1990s and early 2000s. We serve Keller homes from the Dallas-Fort Worth area, with crews working locally every week. Call (971) 497-2402 for a written price before any work starts.

Contractor spraying sealant during professional garage conversion into an ADU. in Keller, TX

Call (971) 497-2402

Keller’s housing stock is unusual, and it changes the math on garage conversions. Thousands of homes here were built with three-car garages topped by already-framed bonus rooms. That’s a head start most cities don’t offer. But it also means Keller inspections turn up framing, electrical, and foundation issues that generic contractors don’t plan for. If you’re weighing this project, you want someone who knows exactly what Keller building inspectors flag on these homes, not someone meeting your floor plan for the first time.

  • Key takeaway: Bonus rooms above three-car garages are the fastest path to an ADU in Keller, but most were framed for storage, not bedrooms. Expect an engineer’s letter before the permit moves.
  • Key takeaway: Detached garage conversions on Keller’s Blackland Prairie clay need post-tension slabs and grade beams. That’s a $20,000-$30,000 line item that shocks first-time builders.
  • Key takeaway: We write the price before work starts. Not an estimate range. A written number, under Haven Standard Clause 1.

Why Ellery ADU Studio Is the Garage Conversion ADU Team Keller Calls

A kitchenette inside a converted garage

Ellery ADU Studio has designed, permitted, and built 900+ ADUs since 2015, and our Keller work skews heavily toward garage conversions and bonus-room turnovers. We know the pre-2008 framing conventions, the clay-soil foundation requirements, and the Keller ISD-driven multigenerational layouts families ask for. We’re not guessing at your city’s codes. We’ve already built here.

The single biggest complaint we hear from Keller homeowners is the same one: a contractor opened a wall, found something the contract didn’t cover, and handed them a change order. We handle it differently. Every project includes a written scope under Haven Standard Clause 5, allowances for the known-unknowns, and a rule that any surprise is priced and approved in writing before we touch it. That’s why our Keller clients get a documented photo record at every visit and never a door-side upsell.

We also give a Free Second Opinion on any written estimate you already have in hand. If another company quoted you a garage conversion in Keller, send it to us. We’ll walk through the numbers line by line and tell you where the framing, slab, or electrical costs are missing. No pressure. Just math.

Our Garage Conversion ADU Services in Keller

Attached Garage Conversion

Attached garage conversions are the most common Garage Conversion ADU project we permit in Keller. The garage already shares a wall with the house, which means plumbing and electrical runs are shorter, and the roof is already on. In Keller neighborhoods like Marshall Ridge and Heritage, we typically convert the garage into a one-bedroom unit with a kitchenette and full bath, adding a private entrance on the side or rear elevation. What surprises Keller homeowners is the electrical panel. A 1990s or 2000s panel sized for the original house rarely handles a new kitchen and bath. We include the panel upgrade or sub-panel in the written price, not in a surprise addendum.

Under The Haven Standard, your attached garage conversion gets a permit set, a written scope, and a photo record at every visit. We don’t hide the code upgrades. We show them to you before we cut the first stud.

Detached Garage Conversion

Detached garage conversions in Keller usually mean one of two things: converting an existing detached garage into an ADU, or demolishing one and building new. The foundation question dominates both paths. Keller sits on Blackland Prairie clay, a shrink-swell soil that moves seasonally more than most homeowners realize. For a new detached ADU slab, Keller’s inspectors and our engineers require a post-tension slab with extended grade beams. That line item alone is routinely $20,000-$30,000. If you’re converting an existing detached garage, we have to verify the slab was engineered for that soil movement. Many weren’t.

We inspect first. Then we write the price. If the slab needs work, you’ll know before the contract is signed, not after demo starts.

Carport Conversion

Carport conversions are less common in Keller than in older Tarrant County cities, but we do see them on pre-1990 properties along Keller-Smithfield Road and near Old Town Keller. A carport lacks a full foundation and enclosed walls, so converting one to an ADU means building both. That’s functionally a small detached build, with the same clay-soil foundation requirements. The advantage is that the footprint already exists, and sometimes the setback variance is simpler because the structure predates current code. We handle the permit set, the engineering, and the build under one contract, so the foundation engineer and the framing crew are on the same page, not pointing at each other.

Garage Partition & Bathroom Add

For families keeping grandparents close to Keller ISD schools, a full garage-to-ADU conversion isn’t always the right move. Sometimes the smarter project is a partition wall that splits the three-car garage, plus a bathroom and kitchenette on the new side. This is the fastest, least expensive way to create a private in-law suite in Keller, typically running $90,000-$150,000 depending on finishes and plumbing complexity. We’ve done these in Hidden Lakes and Villages of Woodland Springs, where the garages are large enough to split and still leave a two-car bay for the primary residence.

Under one contract, we draw it, permit it, and build it. You get a written price for the whole thing, not a separate designer’s set and a separate builder’s guess.

Professional contractor applying spray foam insulation during a garage conversion project in Keller, TX
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

Trusted Brands We Specify in Keller

Some Keller homeowners want a site-built garage conversion. Others want a prefab or modular system, and we specify and coordinate both under the same contract. For Keller projects we work regularly with Cover, Dvele, and Boxabl, coordinating their panelized or modular systems into the permit set and site plan. We don’t just hand you a catalog. We make sure the system you choose meets Keller’s wind, soil, and live-load requirements before you spend a dollar on it. That’s the difference between a design-build studio and a contractor who subcontracts a prefab broker.

Common Garage Conversion ADU Problems We See in Keller Homes

  • Bonus rooms framed for storage, not living space. Keller’s 1990s and 2000s builders frequently used 2×8 joists sized for light storage above three-car garages. Residential occupancy requires a 40 psf live load. Keller inspectors hold the permit until an engineer verifies the framing. We’ve seen this add 4-6 weeks and $8,000-$18,000 to a project. We check the joist size and spacing before we write the price.
  • Electrical panels from the 1990s can’t carry an ADU kitchen. A new kitchenette, bath, mini-split, and laundry run on the original 150-amp or 100-amp panel will trip the code upgrade requirement. Once walls are open, Keller inspectors require the service upgrade. We write that into the contract up front, not after they flag it.
  • Blackland Prairie clay moves more than people expect. Keller’s expansive clay expands and contracts with every drought and rain cycle. A detached garage conversion on an unreinforced slab will crack, shift, and fail. The fix, an engineered post-tension slab with grade beams, is a $20,000-$30,000 line item. We include it in the written price and explain exactly why it’s there.
  • Waterproofing failures at the garage-to-house transition. When a garage becomes living space, the old slab edge and the former garage-door opening become water entry points. We specify a continuous drainage plane, proper step flashing, and a capillary break at the threshold. Keller’s heavy spring rains will find a shortcut if one exists.

Pricing for Garage Conversion ADU in Keller, TX

A new bathroom inside a converted garage

Here are the line-item ranges we quote most often in Keller. Attached garage conversion to a one-bedroom ADU: $180,000-$260,000. Bonus room above a three-car garage converted to a studio or one-bedroom with bath: $120,000-$220,000, depending on framing upgrades. Detached garage conversion with new post-tension slab: $240,000-$320,000. Garage partition with bath and kitchenette: $90,000-$150,000. These are all-in numbers, drawings through final inspection, written before work starts. The framing verification, the panel upgrade, and the slab engineering are included, not added later.

Nothing here is a verbal range. A written price under Haven Standard Clause 1 is the only number we commit to. Call (971) 497-2402 to schedule your free estimate with Ellery ADU Studio team. You’ll get a written number, not a sales pitch.

Project Type in Keller Typical All-In Range
Attached garage conversion (1-bed ADU) $180,000-$260,000
Bonus room above 3-car garage (studio/1-bed) $120,000-$220,000
Detached garage conversion (new slab) $240,000-$320,000
Garage partition + bath + kitchenette $90,000-$150,000

We Also Serve Cities Near Keller

The local pros work regularly across northeast Tarrant County. Beyond Garage Conversion ADU in Keller, we serve North Richland Hills, Southlake, Haltom City, and Colleyville. The clay-soil foundation requirements are the same across the region, but each city has its own inspection quirks, and we know them city by city, not from a template.

Serving Keller, TX - Our Local Coverage Area

We’re serving the Keller area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Garage Conversion ADU in Keller

An attached garage converted into living space

Get Your Written Keller Garage Conversion ADU Price

In a Keller neighborhood off Bear Creek Parkway, the local pro opened a 2006-built bonus room above a three-car garage for a family keeping grandparents close to Keller ISD schools. The flooring revealed a 2×8 joist system sized for storage, not residential occupancy. Our engineer’s letter and a $14,000 framing upgrade to 2x10s at 12-inch centers brought it to code before Keller inspectors signed off. The project wrapped with a private entrance, a full bath, and a structural retrofit that added four weeks to the timeline but zero surprises for the family’s budget. That’s how we work in Keller: inspection first, written scope second, no door-side changes.

If you’re ready to price your garage conversion ADU in Keller, call (971) 497-2402. You’ll speak to a live person, schedule a site visit, and get a written price before any work starts. No “call for a quote.” No estimate range. Just the number, in writing, with a Done Right Promise behind it.

Written by the team at Ellery ADU Studio.

Why Keller Chooses Ellery ADU Studio

We set the standard for garage conversion ADU in Keller.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Keller

Getting your garage conversion ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your garage conversion ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local garage conversion ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Keller Customers Say

Trusted by homeowners across Keller and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D.
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V.
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N.

More ADU services in Keller

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for Garage Conversion ADU in Keller?

Call now for a free estimate, or request one below. Licensed, insured, and here with fast after-hours help in Keller.

(971) 497-2402

Request a Free Estimate in Keller

Tell us about your garage conversion ADU needs. We'll respond within the hour.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Areas We Serve
Call Now - 24/7 Dispatch