Garage Conversion ADU in Kissimmee, FL | Ellery ADU Studio

Garage Conversion ADU in Kissimmee - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

392+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable Garage Conversion ADU Across Kissimmee

Garage conversion ADUs in Kissimmee typically run $145,000-$225,000 all-in, from permit set through final inspection, depending on whether you’re converting an attached two-car garage into a studio or adding plumbing for a full one-bedroom unit. The Kissimmee market carries a structural wrinkle most cities don’t have: your finished ADU still can’t legally take a single short-term rental booking until it clears a separate Florida DBPR licensing inspection and receives an Osceola County vacation rental certificate. We coordinate both tracks so the gap between final building inspection and first legal booking is weeks, not months. If you’re weighing a garage conversion along the US-192 corridor or in a community like Windsor Hills, call (971) 497-2402. We’ll give you a written price before any work starts.

Contractor spraying sealant during professional garage conversion into an ADU. in Kissimmee, FL

Call (971) 497-2402

Why Ellery ADU Studio Is Kissimmee’s Preferred Garage Conversion ADU Company

Ellery ADU Studio works differently than the contractor you might be comparing us against. We’re a design-build studio. The drawings, the permit set, and the construction are a single contract at a single written price. That means when something goes sideways with Osceola County plan review or an HOA architectural committee, there’s no designer pointing at a builder and no builder pointing back. One contract, one accountable party. Nadia Ellery founded the studio in 2015, and every Kissimmee project carries the same three clauses: a written price before work starts, a documented photo record on every visit, and a 365-Day Done Right Promise that says if the finished ADU isn’t built to the permitted drawings, we make it right.

Kissimmee homeowners ask us questions other markets never raise. Will the HOA reject my stucco color? Do I need a separate DBPR inspection? Does Osceola County require its own vacation rental certificate beyond the state license? We answer those questions with specifics, because we’ve filed these applications and sat through these reviews. The teams that serve Kissimmee are dispatched from our Orlando office, but the crews work locally and know the subdivisions, the HOA patterns, and the county reviewers by name. Our Garage Conversion ADU team has designed, permitted, and built 900+ ADUs since 2015, every one with a written price before work began and a documented photo record when work was complete.

Our Garage Conversion ADU Services in Kissimmee

Technician installing HVAC system during a professional garage conversion ADU project
Our Garage Conversion ADU Services in Kissimmee

Attached Garage Conversion

Attached garage conversions are the most common ADU pathway in Kissimmee, because the 1990s-2010s concrete block stucco homes along the tourist corridor were built with two-car garages that rarely get used for cars. Converting that footprint into a studio or one-bedroom ADU means the slab, the walls, and the roof are already there. The work is interior finish, a kitchenette, a bathroom rough-in, and a dedicated HVAC line. In communities like Windsor Hills and the Formosa Gardens area, our submittal packet includes the stucco-match specification and the window schedule the HOA committee expects to see on a converted garage front.

Attached Garage Conversion

Detached Garage Conversion

A detached garage conversion gives you separation from the main house, which matters when the ADU will be listed as a separate STR unit. Guests come and go on their own schedule, and the main house stays quiet. In Kissimmee’s pancake-flat terrain, detached structures sit on the same slab-on-grade foundation as the main home, so we’re not dealing with basements or frost lines. We are dealing with Osceola County’s high water table, and we specify drainage and slab details accordingly. Every detached conversion we quote in Kissimmee includes the site plan, the utility trench, and the dedicated mini-split load calculation.

Detached Garage Conversion

Carport Conversion

Carport conversions are less common in Kissimmee than attached garage conversions, mostly because the housing stock skews toward enclosed garages. When we do specify one, it’s usually on older homes where the carport is open on two or three sides. We frame and enclose the structure, pour any required thickened edge, and run the same permit package through Osceola County. The HOA conversation is different here: many Kissimmee subdivisions require the enclosed structure to read as original to the home, which pushes us toward matching fascia, matching stucco texture, and window styles that match the main house.

Carport Conversion

Garage Partition & Bathroom Add

A garage partition splits the existing garage footprint, leaving storage or a two-car bay on one side and building a studio or bedroom suite on the other. Kissimmee homeowners choose this when they still want a garage for a car or a golf cart but want the ADU income too. The bathroom add is the big cost driver: it requires the water supply, the drain, and the vent stack, and Osceola County plumbing review is exacting on fixture counts and drain sizing. We size and specify the bathroom in the permit set, and our plumbers rough it in after framing. The partition wall itself is standard framing; the plumbing is where you want a studio that’s done this in Kissimmee subdivisions before.

All four of these fall under our one-contract Garage Conversion ADU in Kissimmee service. One written price, one permit set, one studio accountable for the whole thing.

Professional contractor applying spray foam insulation during a garage conversion project in Kissimmee, FL
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Kissimmee

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and James Hardie, and we bring those brands into Kissimmee projects where they make sense. Abodu and Cover work well when the schedule is tight and the unit is a detached studio; we specify them and handle the site prep, the utilities, and the county permit filings under the same single contract. James Hardie lap siding and panel products come up constantly in Kissimmee HOA reviews, because the committees want exterior finishes that match the existing CBS wall texture and don’t read as a add-on. We keep local specification details on file for Kissimmee projects, so the submittal doesn’t stall waiting on a vendor cut sheet.

Common Garage Conversion ADU Problems We See in Kissimmee Homes

Contractor spraying sealant during professional garage conversion into an ADU.
Common Garage Conversion ADU Problems We See in Kissimmee Homes
  • HOA architectural review rejects mismatched porch columns or stucco color on the converted garage front. Kissimmee subdivisions platted for vacation rentals are strict about curb-level consistency. A garage front that doesn’t match the main house forces a resubmittal and stalls the permit clock. We include the stucco-match spec and the window schedule in the first submittal so the committee doesn’t bounce it.
  • Using the main home’s central HVAC for the ADU leads to mold in the unoccupied unit between STR turnovers. Kissimmee’s subtropical humidity means a sealed, unoccupied guest unit that shares the main system won’t dehumidify on its own. Each ADU needs a dedicated mini-split sized for the sealed volume. We specify it in the permit set, and we don’t waive it.
  • Ignoring DBPR and Osceola County vacation rental certification until after final building inspection delays first revenue by 6-10 weeks. This is the Kissimmee-specific failure mode. The building permit is not the same as the vacation rental certificate. Homeowners who discover this after construction finish the unit in March and book their first legal night in June. We file both tracks in parallel.
  • High water table and saturated lots complicate drainage on detached structures. Osceola County’s flat terrain and summer afternoon storm flooding mean a detached ADU on an already-saturated lot can channel water toward the main slab. We detail the drainage line in the permit set and address it during site prep, before the slab pour.
Get the price in writing before anything starts.Serving Kissimmee - a real person answers, day or night.
Call now

Pricing for Garage Conversion ADU in Kissimmee, FL

Attached garage conversions in Kissimmee run $145,000-$195,000 all-in. Detached garage conversions run $185,000-$225,000. Garage partitions with a bathroom add typically fall between $165,000 and $215,000 depending on the plumbing run and the size of the added suite. Those ranges include the permit set, the Osceola County plan review, the construction, the dedicated mini-split, and the final inspection. What moves the number is the plumbing: a studio with a kitchenette and a wet bath costs differently than a one-bedroom with a full bathroom. Under Haven Standard Clause 1, your written price is set before work starts, and under Clause 5, the scope is locked at signing. No door-side upsells. Call (971) 497-2402 for a written quote on your specific garage footprint. Estimates are free.

We Also Serve Cities Near Kissimmee

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
We Also Serve Cities Near Kissimmee

Our crews serve Kissimmee and the surrounding metro: Kissimmee, Orlando, Lakeland, Melbourne, and Daytona Beach. If you’re in a nearby city and weighing a garage conversion ADU with the same HOA and STR duality, the same written-price guarantee applies. Call (971) 497-2402.

Serving Kissimmee, FL - Our Local Coverage Area

We’re based in the Kissimmee area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - Garage Conversion ADU in Kissimmee

Professional contractor applying spray foam insulation during a garage conversion project
FAQs - Garage Conversion ADU in Kissimmee

Why Kissimmee Chooses Ellery ADU Studio

We set the standard for garage conversion adu in Kissimmee.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Kissimmee

Getting your garage conversion adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your garage conversion adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Kissimmee - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local garage conversion adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Kissimmee Customers Say

Trusted by homeowners across Kissimmee and surrounding areas.

★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for Garage Conversion ADU in Kissimmee?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Kissimmee.

(971) 497-2402

Request a Free Estimate in Kissimmee

Tell us about your garage conversion adu needs - we'll respond within the hour.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Areas We Serve
Call Now - Fast Dispatch