New Detached ADU in Campbell, CA | Ellery ADU Studio

New Detached ADU in Campbell - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

392+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable New Detached ADU Across Campbell

A new detached ADU in Campbell typically runs $285,000-$420,000 all-in, from permit set through final inspection, depending on site access, foundation condition, and whether you choose custom framing or a prefab system like Abodu or Cover. The work usually takes 7-11 months from design kickoff to certificate of occupancy. If you’re standing on a 1950s ranch lot off Winchester Boulevard wondering whether a detached unit fits your side yard, it very likely does; the real question is how the drawings, the setbacks, and the fire-access rules shape the floor plan.

Workers installing steel structural framing for a new detached ADU construction. in Campbell, CA

Call (971) 497-2402

We know Campbell’s lots because we’ve built on them. The 6,000 to 9,000 square foot parcels, the slab-on-grade ranches, the VTA corridor rules along Winchester and downtown. That local familiarity means your quote reflects what’s actually on your property, not a generic number. Call (971) 497-2402 to schedule a free estimate. We’ll walk the site, measure the clearances, and give you a written price before any work starts.

Why Ellery ADU Studio Is Campbell’s Preferred New Detached ADU Company

Ellery ADU Studio has operated as a design-build practice since 2015. That matters for a Campbell project because our drawings, permit set, and construction fall under one contract at one written price. When the designer and the builder are the same studio, the blame gap that slows down so many ADUs doesn’t exist. Nadia Ellery built the studio around that principle, and it shows up in every permit set we file with Campbell’s building department.

Campbell homeowners tend to research before they call. They’ve read the horror stories about projects that stall in plan check or blow past the original estimate. Our answer is documented: 900+ ADUs designed, permitted, and built since 2015, every one with a written price before work started and a documented photo record when work was complete. Under Haven Standard Clause 5, the scope is locked at signing. No door-side upsells, no scope creep.

Crews serving Campbell coordinate from our San Francisco Bay Area office and work locally. The Campbell building department, staffed for a city of about 42,000, turns around ADU permit reviews faster than San Jose’s larger department across the shared border. That’s a real scheduling advantage for Campbell projects, and we factor it into our timelines.

Our New Detached ADU Services in Campbell

construction workers installing trim on the exterior of a detached ADU
Our New Detached ADU Services in Campbell

We build four types of detached ADUs across Campbell, each with different site implications. Here’s how they map to the city’s post-war ranch lots.

Custom Built ADU

A custom-built detached ADU gives you the most control over floor plan and materials, which matters on Campbell lots where the buildable area is tight. We typically design these as 500-800 sq ft one-bedroom or two-bedroom units, sized to the yard while respecting Campbell’s 4-foot side and rear setbacks. The permitting path is straightforward: we prepare the full permit set, file with Campbell’s building department, and manage the construction through final inspection under one contract.

Custom Built ADU

Prefab ADU Installation

Prefab installation changes the construction sequence. On Virginia Avenue near the Winchester light rail station, our crew built a detached 1-bed ADU for a 1962 ranch on a 7,000 sq ft lot. We staged the pre-framed wall panels from Abodu on the driveway edge and parked the crane in the street with a city-issued no-parking permit, while our electrician ran a 100-amp subpanel from the main lug to a mini-split heat pump sized for Campbell’s 90-degree summers, all without breaking the 4-foot side-yard setback required by Campbell Municipal Code.

For Campbell homeowners, prefab often means fewer weeks of on-site construction and less disruption to a tight lot where staging space is scarce. We specify and coordinate systems from Abodu, Cover, and Dvele within the same single contract.

Prefab ADU Installation

Modular ADU

Modular ADUs arrive as larger completed sections rather than flat-packed panels. The trade-off on a Campbell lot is crane access and delivery logistics. We plan the delivery route with the city, secure the no-parking permits, and coordinate with neighbors so the crane work happens in a single day. Modular units work well on lots where the setback math leaves a clean buildable rectangle, and they often compress the framing and rough-in phase significantly.

Modular ADU

Studio ADU

A studio ADU is the most efficient way to add a rentable or guest unit on a smaller Campbell lot. At 400-500 sq ft, a studio still works within the yard-space constraints on a 6,000 sq ft parcel. We design these with a full bath, a compact kitchen, and a mini-split heat pump sized for the upper-80s to mid-90s summer highs Campbell gets inland from the fog belt. The permit path is identical to larger units; the build is just faster.

Two construction workers installing a wooden frame for a new ADU in Campbell, CA
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Campbell

We specify and coordinate prefab and modular systems from Abodu, Cover, and Dvele for Campbell projects, and we use James Hardie siding where the design calls for a fiber-cement exterior that holds up to Campbell’s dry summers and mild winters. Because our crews work locally, we can respond quickly when a panel arrives with shipping damage or a hardware kit is missing a component. Our New Detached ADU team knows these systems well enough to catch specification issues before they reach the site, which spares Campbell homeowners the delay of a re-order.

Common New Detached ADU Problems We See in Campbell Homes

Workers installing steel structural framing for a new detached ADU construction.
Common New Detached ADU Problems We See in Campbell Homes
  • Party-wall notice gaps near shared fences. When a detached ADU comes within 3 feet of a shared side fence on a 1950s ranch, Campbell’s building department expects a party-wall notice to be filed. Miss that step and final inspection gets delayed by weeks while the paperwork catches up.
  • Fire-access red tags on VTA-adjacent lots. The half-mile transit corridor around Campbell and Winchester stations lets neighbors convert garages to ADUs without parking replacement, but your detached build can still get flagged for blocking the remaining fire-access lane. We’ve seen red tags on San Tomas Expressway-adjacent lots where the yard geometry wasn’t fully thought through.
  • Water pressure spikes from drought conditions. Campbell’s periodic drought-driven pressure fluctuation from the San Jose Water Company can blow the seals on a tankless water heater if you don’t specify a pressure-reducing valve. We include that valve in our plumbing specs as standard practice for Campbell builds.
  • Slab foundations built before insulation was code. The dominant Campbell housing stock is slab-on-grade ranch homes built between 1950 and 1975. Those slabs were never insulated or moisture-proofed for habitation, so a detached ADU on an existing slab almost always requires a vapor barrier and new insulation before finish work begins. If the existing garage slab is 4 inches and within range, the foundation line item changes; our site assessments always include that measurement.
Get the price in writing before anything starts.Serving Campbell - a real person answers, day or night.
Call now

Pricing for New Detached ADU in Campbell, CA

A detached ADU in Campbell runs these ranges, all-in from drawings through final inspection:

  • Studio ADU (400-500 sq ft): $285,000-$340,000
  • 1-Bed / 2-Bed Custom Detached ADU (500-800 sq ft): $340,000-$420,000
  • Prefab ADU Installation (Abodu, Cover, or Dvele system): $310,000-$390,000
  • Modular ADU (crane-delivered sections): $325,000-$400,000

These numbers reflect Campbell’s specific conditions: post-war ranch lots with limited staging space, Campbell’s 4-foot setback requirement, the need for full electrical panel upgrades on 1950s-era services, and Title 24 all-electric compliance with mini-split heat pumps. Every quote is a written, line-item price before any work begins. Under Haven Standard Clause 1, the words “call for a quote” don’t appear in our documents; the price is already on the page.

We Also Serve Cities Near Campbell

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
We Also Serve Cities Near Campbell

Our crews work regularly in Saratoga, Los Gatos, Santa Clara, and Cupertino. If you’re on a shared border street, the Campbell side of the line often moves faster through plan check. We’ve built New Detached ADU in Campbell projects on lots adjacent to Los Gatos and Saratoga, and the city boundary doesn’t change how we handle the site work.

Serving Campbell, CA - Our Local Coverage Area

We’re based in the Campbell area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Campbell

Two construction workers installing a wooden frame for a new ADU
FAQs - New Detached ADU in Campbell

Call Ellery ADU Studio for Your Campbell New Detached ADU

A detached ADU on a Campbell ranch lot is a yard-space puzzle with real dollar figures attached. We solve it with a permit set that documents every setback, a written price that locks the scope, and a 365-Day Done Right Promise in writing before the project starts. If you have another written estimate in hand, bring it in; we’ll give you a free second opinion on it. Call (971) 497-2402 to schedule your free estimate today.

Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Campbell since 2015.

Why Campbell Chooses Ellery ADU Studio

We set the standard for new detached adu in Campbell.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Campbell

Getting your new detached adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your new detached adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Campbell - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local new detached adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Campbell Customers Say

Trusted by homeowners across Campbell and surrounding areas.

★★★★★

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

Benedict H. · Verified customer
★★★★★

"Handled the whole planning process. We went to one hearing and that was it."

Rowena C. · Verified customer
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Campbell?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Campbell.

(971) 497-2402

Request a Free Estimate in Campbell

Tell us about your new detached adu needs - we'll respond within the hour.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Areas We Serve
Call Now - Fast Dispatch