New Detached ADU in Orange, CA | Ellery ADU Studio

New Detached ADU in Orange - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

392+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable New Detached ADU Across Orange

A new detached ADU in Orange typically runs $210,000-$390,000 all-in, drawings through final inspection, depending on whether you’re building a studio unit in a postwar ranch backyard or a period-correct two-bedroom behind a Craftsman in Old Towne. We’re Ellery ADU Studio, and we’ve designed, permitted, and built over 900 ADUs since 2015, every one with a written price before work started. If you’re weighing a detached unit on a large lot near Orange Park Acres or a rear-alley garage conversion off Glassell Street, call (971) 497-2402 and you’ll get a live person, a documented scope, and a number you can take to the bank.

Workers installing steel structural framing for a new detached ADU construction. in Orange, CA

Call (971) 497-2402

Why Ellery ADU Studio Is Orange’s Preferred New Detached ADU Company

Orange homeowners don’t hire the cheapest bid. They hire the team that knows the Old Towne Design Standards board will reject vertical HardiePanel on a 1912 Craftsman, and that the same board will pass lap siding with a 2-over-1 window pattern on the first submission. That’s the difference between a nine-month build and an 18-month permit fight. Our clients in the Presidential Streets and the Fairhaven neighborhood keep our name in their back pocket because we document everything: the permit set, the photo record on every visit, the written scope at signing. No designer-versus-builder finger-pointing, because the drawings and the construction are one contract with one written price.

We serve all of Orange from our Los Angeles dispatch office, with crews on-site across the city within a day of scheduling. The reason we’re the team Orange calls for a New Detached ADU is straightforward: we quote the septic setback, the design review timeline, and the Title 24 window package before we ever put a shovel in the ground. Nadia Ellery founded this studio in 2015, the year California’s ADU permitting landscape shifted, and she built the practice around a simple rule: if the finished ADU is not built to the permitted drawings, we make it right. That promise is in writing, before the project starts, and it’s called the 365-Day Done Right Promise.

Our New Detached ADU Services in Orange

construction workers installing trim on the exterior of a detached ADU
Our New Detached ADU Services in Orange

Custom Built ADU

A custom detached ADU in Orange starts around $230,000 for a one-bedroom on a standard 6,000-square-foot lot and climbs past $400,000 for a two-bedroom with a full kitchen and a separate entry off a rear alley in Old Towne. The variables that move the number: foundation type (post-tension slab versus raised perimeter, which matters on Orange’s older clay soils), the roof pitch the design board will approve, and whether the lot has room for a standard 4-foot side setback or needs a variance. We scope every one of these before quoting, so the written price at signing is the price at final inspection.

Custom Built ADU

Prefab ADU Installation

Orange owners who want a faster build often spec a prefab system, and we coordinate the full installation under the same single contract. For a prefab unit from Cover or Dvele, expect $180,000-$280,000 delivered and set, plus site work, foundation, and utility connections. In Old Towne, the prefab conversation gets specific: the design board will want to see period-appropriate cladding and window proportions, not a stock modern box. We’ve navigated that review enough times to know which prefab models clear it and which ones stall, and we’ll tell you before you write a deposit.

Prefab ADU Installation

Modular ADU

Modular construction makes sense on Orange’s larger lots, especially off Cannon Street and east of the 55, where crane access is straightforward and the building department’s plan check moves efficiently. A modular one-bedroom typically runs $200,000-$300,000 all-in, with the module set in a day and the site work, foundation, and utility tie-ins taking another six to ten weeks. Mighty Buildings is one brand we specify regularly for Orange clients, particularly where the lot slopes and we need to minimize excavation with a lighter panelized system.

Modular ADU

Studio ADU

A studio detached ADU in Orange is the leanest path to a rentable unit: $160,000-$220,000 for a 400-500-square-foot build with a kitchenette and a full bath. On a standard ranch lot in central Orange, that’s a six-to-eight-month project with a written price locked at signing. In Old Towne, a studio ADU behind a Victorian still has to meet the same design standards review as a larger unit, which means the material budget shifts toward wood windows and lap siding, but the overall cost stays within that range because the footprint is smaller.

We also handle garage conversion ADUs, junior ADUs, and full site prep and utilities under the same one-contract model. Whatever the scope, you’ll get a documented photo record on every visit and a permit set that the city of Orange’s plan checker actually approves on the first pass.

Studio ADU
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Orange

We specify and coordinate prefab and modular systems from Dvele, Mighty Buildings, Boxabl, and several other manufacturers, and we’re fluent in what each one does well in Orange’s climate. A Dvele unit near the Santa Ana wind corridor needs a more tightly sealed envelope than the stock package, so we spec upgraded weather stripping and a higher-R wall assembly before the module ships. A Mighty Buildings panelized shell can cut foundation time on Orange’s expansive clay, which matters when you’re building on a lot that needs grading. We don’t push a brand; we push the system that matches your lot, your budget, and the design board in front of you. The brand decision is made inside one written quote, not as a change order later.

Common New Detached ADU Problems We See in Orange Homes

Workers installing steel structural framing for a new detached ADU construction.
Common New Detached ADU Problems We See in Orange Homes
  • Septic and leach field setbacks on county-permitted acreage. Building on land under county jurisdiction means you’re working with Environmental Health setback rules, not just building code. We verify the septic tank location and leach field dimensions before we finalize a foundation location, because a 12-foot shift after excavation starts is a five-figure mistake.
  • Old Towne Design Standards review rejections. Submitting a plan with modern stucco, vinyl windows, or a flat roofline behind a Craftsman primary will get bounced. The board reviews siding material, window proportions, and roof pitch against the period character of the original structure, and resubmissions add 6-10 weeks each cycle.
  • Drainage and grading on open lots. Orange gets concentrated winter rains, and a new detached ADU on a sloped lot without a proper swale sends water against the foundation within the first season. We scope grading and drainage as a line item, not an afterthought.
  • Electrical panel capacity on 1950s-70s ranch homes. The original 100-amp panel that served the house rarely has room for an ADU’s load. We spec the panel upgrade in the written quote, so the cost doesn’t materialize mid-project as a door-side upsell.
Get the price in writing before anything starts.Serving Orange - a real person answers, day or night.
Call now

Pricing for New Detached ADU in Orange, CA

Here are the numbers we quote in Orange, and they’re the numbers you’ll see on the written price before any work begins.

Two construction workers installing a wooden frame for a new ADU in Orange, CA
  • Studio ADU: $160,000-$220,000
  • One-bedroom detached ADU: $210,000-$290,000
  • Two-bedroom detached ADU: $280,000-$390,000
  • Prefab installation (Cover, Dvele, Mighty Buildings): $180,000-$280,000, plus site work
  • Old Towne design review compliance package: $8,000-$25,000, depending on material requirements

You get these numbers in a written line-item quote before the project starts, under Haven Standard Clause 1. If you already have an estimate from another builder, bring it in. We’ll give you a free second opinion on it, line by line. Call (971) 497-2402.

Building on Acreage Around Orange: County Permitting, Septic Setbacks, and What Changes the Price

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
Building on Acreage Around Orange: County Permitting, Septic Setbacks, and What Changes the Price

Most ADU conversations in Orange happen on standard residential lots, but there’s a whole other set of rules when you’re building a detached unit on acreage east of the 55, out toward the unincorporated pockets near Orange Park Acres and Santiago Canyon Road. Those properties fall under Orange County building jurisdiction, not city of Orange permitting, and the difference is not a formality. County plan check means you’re coordinating with county Environmental Health for septic tank and leach field setbacks, not just the city’s building department. A septic tank on a county-permitted lot typically requires a 5-foot setback from the ADU foundation, and a leach field requires 10 feet, but the exact numbers depend on soil percolation tests that the county runs before it will approve a foundation location.

This is where our process saves Orange owners from a costly redesign. In the Old Towne district near Glassell Street, we built a detached ADU behind a 1912 Craftsman where the county-approved septic setback forced a 12-foot shift in the foundation. Our crew coordinated a tight alley access for the James Hardie plank delivery and matched the primary home’s lap siding and 2-over-1 window pattern to clear the design board without a single resubmission. That’s the job: knowing the setback math before the excavation starts, and knowing the design board’s vocabulary well enough to write the permit set in it.

Grading and drainage change the price on open lots, too. A sloped acreage lot in Orange needs a swale, and sometimes a retaining wall, to keep winter rainwater off the ADU foundation. That’s a line item we scope before quoting, along with the longer material hauls and equipment access. We don’t wait until the excavator arrives to discover the lot drains toward the build site. The written price includes the grading plan, because the county will ask for one, and because the first winter rains will expose it if we didn’t.

We Also Serve Cities Near Orange

From our Los Angeles dispatch office, our crews serve homeowners throughout Orange and the surrounding cities, including Santa Ana, Tustin, Garden Grove, and Placentia. If your property sits near the city line, we’ll bring the same written-price model and the same documented photo record to your project, wherever the county draws the boundary.

Serving Orange, CA - Our Local Coverage Area

Architect sketching custom ADU floor plan on grid paper for permitting
Serving Orange, CA - Our Local Coverage Area

We’re based in the Orange area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Orange

Why Orange Chooses Ellery ADU Studio

We set the standard for new detached adu in Orange.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Orange

Getting your new detached adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your new detached adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Orange - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local new detached adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Orange Customers Say

Trusted by homeowners across Orange and surrounding areas.

★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer
★★★★★

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

Odette N. · Verified customer
★★★★★

"They walked us through setbacks and utility capacity before we paid anything, and told us one of our two options was not going to get approved."

Mireille T. · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Orange?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Orange.

(971) 497-2402

Request a Free Estimate in Orange

Tell us about your new detached adu needs - we'll respond within the hour.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Areas We Serve
Call Now - Fast Dispatch