New Detached ADU in Studio City, CA | Ellery ADU Studio

New Detached ADU in Studio City - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

Call to schedule your free estimate

392+
Cities Served
Free
Written Quotes
Licensed & Insured Written Quotes Free Estimates All Brands Satisfaction Guarantee

Fast, Reliable New Detached ADU Across Studio City

A new detached ADU in Studio City typically runs $280,000 to $450,000 all-in, drawings through final inspection, with hillside parcels north of Ventura Boulevard landing at the higher end of that range because of Los Angeles fire code upgrades. Permitting through the LA Department of Building and Safety takes four to seven months for a standard flat-lot ADU and seven to twelve months when the Very High Fire Hazard Severity Zone overlay applies. We work across Studio City from the valley floor up into the Fryman Canyon and Coldwater Canyon hillsides, and our team has pulled permits for detached ADUs on both sides of that fire zone boundary. Call (971) 497-2402 to get a written price before any work starts.

Workers installing steel structural framing for a new detached ADU construction. in Studio City, CA

Call (971) 497-2402

Why Ellery ADU Studio Is Studio City’s Preferred New Detached ADU Company

Ellery ADU Studio has designed, permitted, and built 900+ ADUs since 2015 under a single design-build contract. That matters in Studio City because the biggest source of ADU project failure is the handoff between a designer who draws one thing and a builder who builds another. We eliminate that gap. Nadia Ellery leads the studio, and every Studio City project carries the same documentation: a permit set that the city actually accepts, a written price before work starts, and a documented photo record of every site visit.

What separates us in Studio City specifically is that we know the LA Department of Building and Safety’s hillside requirements before we quote your project, not after demolition starts. We have run dozens of Studio City addresses through the city’s online hazard severity map, and we know which parcels trigger ignition-resistant construction and ember-resistant venting requirements. That knowledge gets written into your line-item scope at signing, so the price you approve is the price you pay. Under Haven Standard Clause 1, every project gets a written price before any work begins. Under Clause 5, the scope is locked at signing. No door-side upsells, no scope creep discovered at the worst possible moment.

Our crews are background-checked and uniformed. A live person answers calls 24/7. If you already have a written estimate from another firm, we will give you a Free Second Opinion and show you where the Studio City-specific items are missing or mispriced.

Our New Detached ADU Services in Studio City

construction workers installing trim on the exterior of a detached ADU
Our New Detached ADU Services in Studio City

Custom Built ADU

A custom built ADU on a flat Studio City lot is a more straightforward proposition than most people assume. The valley floor between Ventura Boulevard and Moorpark Street is dominated by 1940s and 1950s California ranch homes on lots from 6,000 to 10,000 square feet, and many of those parcels have enough rear-yard depth for a 600 to 1,000 square foot detached ADU without a variance. We handle the full design-build scope: site survey, architectural drawings, structural engineering, permit submission, foundation, framing, and finish. If your existing garage is detached and structurally sound, a garage conversion may be more cost-effective, but if you want a separate rental unit with its own address, a custom detached ADU is the right call.

Custom Built ADU

Prefab ADU Installation

Prefab and modular systems have become a serious option for Studio City homeowners who want to compress the construction timeline. We specify and coordinate systems from Cover, Dvele, and Mighty Buildings, among others. The advantage is precision manufacturing off-site, which reduces weather delays and framing errors. The Studio City-specific caveat is that prefab does not exempt you from fire zone requirements. A hillside parcel north of Ventura in the VHFHSZ still needs ignition-resistant exterior assemblies and Class A roofing, regardless of whether the walls were built in a factory. We write those upgrades into the prefab contract up front.

Prefab ADU Installation

Modular ADU

Modular construction works well for the tighter lots common in the hillside neighborhoods off Laurel Canyon Boulevard and along Coldwater Canyon Avenue, where access for a traditional build can be compromised by steep driveways and limited staging space. Modular units arrive in sections and are set with a crane, which means less on-site cutting, less debris, and fewer trade days on your property. We handle the site work, the foundation, the utility connections, and the permit set as one contract. The structure itself is manufactured to spec, and we coordinate with the modular brand so the delivered unit matches the permitted drawings exactly. That match is covered in writing by our 365-Day Done Right Promise.

Modular ADU

Studio ADU

A studio ADU in the 400 to 600 square foot range remains the most popular choice for Studio City owners who want a rental unit with strong monthly income potential or a private space for an aging parent. At 2026 Studio City rents, a well-built studio ADU can command $2,200 to $2,800 a month depending on finishes and access. The design constraints on a flat 6,000 square foot lot are manageable: a 500 square foot studio with a kitchenette, three-quarter bath, and separate entrance fits within the city’s setback requirements on most parcels south of Ventura. On a hillside parcel, the same unit may require retaining walls or a pier-and-beam foundation, which we quantify before you sign anything.

Two construction workers installing a wooden frame for a new ADU in Studio City, CA
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

Trusted Brands We Service in Studio City

Ellery ADU Studio specifies and coordinates prefab and modular systems from Cover, Dvele, Mighty Buildings, and Boxabl within the same single contract that covers design, permitting, and site work. We don’t simply hand you a brand brochure and walk away. Our team handles the engineering review to confirm the system works with your Studio City parcel, orders the unit, manages the delivery, and sees it through final inspection. For Studio City homeowners, the practical benefit is speed: a prefab ADU installation can knock four to six months off the total timeline compared to stick-built construction, assuming your site prep and foundation are already permitted. We stock nothing in a warehouse; every system is ordered for your specific project and your specific address.

Common New Detached ADU Problems We See in Studio City Homes

Workers installing steel structural framing for a new detached ADU construction.
Common New Detached ADU Problems We See in Studio City Homes
  • VHFHSZ surprises after demolition opens. A flat-lot quote gets blown apart when the LA Department of Building and Safety confirms the parcel sits inside the Very High Fire Hazard Severity Zone, triggering $20,000 to $40,000 in fire-hardening upgrades the homeowner was never told about. We run the address through LA’s hazard map before we quote, not after the walls come down.
  • Undersized electrical panels and failed sewer laterals. Studio City’s 1940s and 1950s housing stock commonly carries original 100-amp panels and cast-iron sewer lines. Neither is sufficient for a new ADU with a kitchen and laundry, and both get discovered when the permit review starts. We write allowances for these items into the contract so the price is real, not hopeful.
  • HVAC spec’d for coastal temperatures. Studio City regularly sees summer highs above 100°F, and a mini-split sized for Santa Monica will not hold temperature in an ADU here. We size heat load for the San Fernando Valley’s inland climate, which means a larger condenser and more BTU per square foot than coastal contractors would specify.
  • Hillside foundations that were never priced. Parcels north of Ventura Boulevard climbing toward Fryman Canyon often require caissons or pier-and-beam engineering that adds $30,000 to $80,000 to the foundation line item. A contractor who quotes a flat slab on a hillside lot is guessing. We send a soils engineer when the parcel slope indicates anything beyond a standard foundation.
Get the price in writing before anything starts.Serving Studio City - a real person answers, day or night.
Call now

Pricing for New Detached ADU in Studio City, CA

Here are the numbers Studio City homeowners ask for. A 1-bed, 1-bath detached ADU of roughly 600 square feet on a flat lot south of Ventura Boulevard runs $280,000 to $350,000 all-in. A 2-bed, 2-bath unit of 800 to 1,000 square feet runs $350,000 to $450,000. Hillside parcels north of Ventura add $20,000 to $40,000 for fire-hardening requirements and another $30,000 to $80,000 when caissons or pier-and-beam foundations are necessary. A prefab or modular ADU from Cover or Dvele typically lands 10 to 15 percent below stick-built on the structure itself, though site work and fire zone upgrades remain the same. Every Ellery ADU Studio project includes a written price before work starts, per Haven Standard Clause 1, and a documented photo record on every visit. Call (971) 497-2402 for an exact written price for your address.

We Also Serve Cities Near Studio City

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
We Also Serve Cities Near Studio City

Our New Detached ADU team serves Studio City and the surrounding neighborhoods, including North Hollywood, Universal City, Van Nuys, and West Hollywood. If you’re just outside the Studio City line, we still cover your project with the same design-build contract and written pricing. For full details on local permitting and fire zone requirements, see our Studio City page.

Serving Studio City, CA - Our Local Coverage Area

We’re based in the Studio City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs - New Detached ADU in Studio City

Two construction workers installing a wooden frame for a new ADU
FAQs - New Detached ADU in Studio City

Why Studio City Chooses Ellery ADU Studio

We set the standard for new detached adu in Studio City.

No Change-Order Surprises

The written quote you sign is the price you pay. Anything we find mid-job gets priced and approved by you in writing before we touch it.

Licensed & Insured

Fully certified technicians who meet all local and state licensing requirements.

Upfront Pricing

No hidden fees, no surprises. You approve the price before any work begins.

Guaranteed Work

Every repair and installation is backed by our workmanship warranty and satisfaction guarantee.

How It Works in Studio City

Getting your new detached adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your new detached adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Studio City - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local new detached adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Studio City Customers Say

Trusted by homeowners across Studio City and surrounding areas.

★★★★★

"Handled the whole planning process. We went to one hearing and that was it."

Rowena C. · Verified customer
★★★★★

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

Arjun D. · Verified customer
★★★★★

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

Helena V. · Verified customer

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Ready for New Detached ADU in Studio City?

Call now for a free estimate - or request one below. Licensed, insured, and here with fast after-hours help in Studio City.

(971) 497-2402

Request a Free Estimate in Studio City

Tell us about your new detached adu needs - we'll respond within the hour.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Areas We Serve
Call Now - Fast Dispatch