Ellery ADU Studio adu team

Garage Conversion ADU in Pompano Beach - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Pompano Beach, FL

ADU Design & Permitting in Pompano Beach means preparing a full permit set that clears Broward County’s High-Velocity Hurricane Zone review, and that changes the math on every drawing sheet. Most of the single-family stock here dates to the 1950s-1970s CBS construction on 7,500-10,000 sq ft lots, which gives homeowners room to build, but the HVHZ wind-load requirements and FEMA flood-zone overlays add permitting steps that a standard Florida ADU proposal simply doesn’t account for. If you’re weighing a backyard unit or an interior conversion, call (971) 497-2402 and we’ll walk you through what your specific parcel triggers.

Call (971) 497-2402

Why Pompano Beach Homes Are Different

Pompano Beach sits inside Broward County’s High-Velocity Hurricane Zone, the most demanding wind-load code in the country. Every new ADU structure, even a one-bedroom cottage, needs impact-rated windows and doors, engineered roof-to-wall connections, and structural details a non-HVHZ Florida builder would never spec. That’s not optional and it’s not a regional upcharge; it’s the code the permit set must demonstrate compliance with before the building department will stamp it.

The older inland corridors west of US-1, particularly Collier City and the neighborhoods off Martin Luther King Jr. Boulevard, are mostly CBS ranch homes on lots large enough for a detached unit without a variance. But many of those parcels fall inside FEMA AE flood zones because of Pompano Beach’s low elevation and the Intracoastal Waterway cutting through the center of town. An elevation certificate and often a raised foundation or stem-wall design become prerequisites, which catches first-time ADU buyers off guard when the estimate lands. We front-load these items in the written scope so the first number you see is the real number.

Our Main Pompano Beach Services

Two project types dominate the calls we get from Pompano Beach homeowners: converting an existing garage or carport into a rentable unit, and building a fully detached ADU in the backyard. Both go through the same HVHZ and flood-zone review, but the foundation and framing paths are completely different.

Garage Conversion ADU in Pompano Beach

A garage conversion in Pompano Beach usually starts with a CBS shell that’s structurally sound but never designed as living space: no insulation, single-skin block walls, a slab that may sit below the flood elevation. The HVHZ code applies to the new envelope, which means impact-rated openings and a roof connection upgrade even though the footprint stays the same. We’ve also seen plenty of old carport slabs homeowners assume are reusable that turn out to need full replacement once the structural review comes back. Full details on the process and what a Pompano Beach conversion costs are on the Garage Conversion ADU in Pompano Beach page.

Garage Conversion ADU in Pompano Beach

New Detached ADU in Pompano Beach

A new detached ADU in Pompano Beach gives you a clean slab, clean framing, and a building designed to HVHZ standards from the first drawing sheet. The tradeoff is site work: tree removal, foundation elevation if the parcel is in a flood zone, and airspace verification if you’re anywhere near the Pompano Beach Airpark’s Part 77 surfaces off NE 10th Street, where height caps can kill a two-story design before it reaches the building department. See the New Detached ADU in Pompano Beach page for line-item pricing and the full scope.

New Detached ADU in Pompano Beach
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

ADU Design & Permitting in Pompano Beach

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
ADU Design & Permitting in Pompano Beach

ADU Design & Permitting in Pompano Beach is where a written scope becomes a stamped permit set, and it’s the service most homeowners undervalue until the building department responds. The city reviews every ADU against Broward County’s High-Velocity Hurricane Zone code, FEMA flood maps, and FAA airspace surfaces near the Pompano Beach Airpark, so a permit set that clears review in Fort Lauderdale can get bounced here for wind-load details or a missing elevation certificate. That’s the core of our ADU Design & Permitting practice: the drawings, the structural calculations, and the permit coordination are one contract at one written price, so no one can point at a third-party drafter when a comment letter arrives.

Site Assessment

Signs you need it

Your parcel is west of US-1, near the Intracoastal, or within the Airpark’s approach path, and you don’t have a current survey or elevation certificate.

What it costs in Pompano Beach

Site assessment in Pompano Beach typically runs $800-$4,500 all-in, including survey, elevation certificate where required, and a written findings memo with buildable-footprint and height-cap notes.

How we do it

We pull the Broward County flood maps and FAA Part 77 surfaces first, then order the survey and walk the parcel against zoning setbacks before a single design decision is made.

ADU Design & Blueprints

Signs you need it

You have a lot that can legally take an ADU, and you want a permit set that clears HVHZ review without multiple revision rounds.

What it costs in Pompano Beach

Design and blueprints for a Pompano Beach ADU typically run $4,000-$25,000 depending on whether it’s a garage conversion, a JADU, or a detached unit with full structural engineering.

How we do it

We draft the architectural set, coordinate the structural engineer’s HVHZ calculations, and run a Title 24 energy model, then deliver a single PDF package for your review before submission.

Permit Application

Signs you need it

Your drawings are done or you have a set from another designer, and the city’s plan review is asking for structural or energy details you don’t have.

What it costs in Pompano Beach

Permit application and city coordination in Pompano Beach typically runs $1,500-$8,500, covering submission, plan-review response, revision resubmittals, and permit pickup.

How we do it

We submit the set, log every reviewer comment, respond in writing with revised sheets, and track the permit through issuance so you’re not refreshing the city portal.

What ADU Design & Permitting Costs in Pompano Beach

Item Typical range in Pompano Beach
Site assessment, survey & elevation certificate $800-$4,500
ADU design, blueprints & structural engineering $4,000-$25,000
Permit application & city coordination $1,500-$8,500

Does Pompano Beach require an elevation certificate for every ADU?

No. Only parcels inside FEMA-designated flood zones require one, but the Intracoastal waterway puts a surprising number of inland Pompano Beach lots in that category, so we verify flood-zone status before quoting design work. Call (971) 497-2402 for a parcel-specific answer.

How long does HVHZ plan review take in Pompano Beach?

Plan review timelines vary with the building department’s current queue, but HVHZ structural comments are the most common cause of delay. A complete permit set with engineered wind-load details up front moves faster than a set that gets three rounds of comments. Call (971) 497-2402 if you want a written scope for your project.

Junior ADU & Interior Conversion in Pompano Beach

Technician installing HVAC system during a professional garage conversion ADU project
Junior ADU & Interior Conversion in Pompano Beach

Junior ADU & Interior Conversion in Pompano Beach means carving a rentable unit out of square footage you already own: a primary-bedroom wing, a finished garage, a den, or interior square footage that never earned its keep. The challenge here isn’t the foundation or the wind load on a new envelope, it’s the existing 1950s-1970s CBS framing, the electrical panel service size, and Broward County’s review of a second kitchen inside a single-family dwelling. That’s the work behind our Junior ADU & Interior Conversion practice: a permitted interior unit under the same single contract and the same written price, with the same HVHZ review applied to any exterior wall we touch.

Interior JADU

Signs you need it

You have a primary suite, garage, or large utility room sitting underused, and you want rental income without adding a new structure to the lot.

What it costs in Pompano Beach

An interior JADU conversion in Pompano Beach typically runs $40,000-$135,000 all-in, including permit set, kitchenette, bath, egress, and electrical panel work.

How we do it

We verify the existing square footage against the city’s JADU rules, design the separation wall and kitchenette, then pull the permit and build to the stamped set.

Attached Addition ADU

Signs you need it

Your lot can’t clear the setback for a detached unit, or you want the ADU connected to the main house under one roofline.

What it costs in Pompano Beach

An attached addition ADU in Pompano Beach typically runs $150,000-$350,000 all-in, drawings through final inspection, with HVHZ-rated openings and roof connections.

How we do it

We design the addition to tie into the existing CBS structure per the wind-load code, build the new envelope, and run a separate electrical subpanel to the ADU.

What Junior ADU & Interior Conversion Costs in Pompano Beach

Item Typical range in Pompano Beach
Interior JADU conversion $40,000-$135,000
Room-to-ADU conversion with kitchenette $40,000-$135,000
Attached addition ADU $150,000-$350,000

Can I convert part of my Pompano Beach house into a JADU without adding square footage?

Yes, and that’s the most cost-effective path in Pompano Beach’s older CBS homes. The city reviews the interior work as a change of occupancy, which triggers egress, light, and ventilation requirements but usually no new foundation or site work. Call (971) 497-2402 to see if your floor plan qualifies.

Does a JADU in Pompano Beach need a separate electrical meter?

Not necessarily. A subpanel off the main service is usually acceptable, but if your 1950s-era panel is at its load limit, a service upgrade becomes part of the scope. We flag that in the written estimate before work starts. Call (971) 497-2402 for a review.

Get the price in writing before anything starts.Serving Pompano Beach - a real person answers, day or night.
Call now

ADU Site Prep & Utilities in Pompano Beach

Architect sketching custom ADU floor plan on grid paper for permitting
ADU Site Prep & Utilities in Pompano Beach

ADU Site Prep & Utilities in Pompano Beach is the part of the estimate that surprises people, because the existing house’s electrical service, sewer lateral, and slab grade were sized for a 1960s household, not a second dwelling. The city’s flood-zone mapping and the High-Velocity Hurricane Zone wind-load code also shape how we prepare a site: foundation elevation, stem-wall details, and impact-rated mechanical penetrations are all part of the scope. Our ADU Site Prep & Utilities service runs this scope under the same single contract and written price, so the site work and the utility work can’t become a finger-pointing exercise between two different crews.

Foundation & Grading

Signs you need it

Your yard slopes toward the house, or your parcel sits in a FEMA AE flood zone and the ADU slab needs to be raised to meet the freeboard requirement.

What it costs in Pompano Beach

Foundation and grading work in Pompano Beach typically runs $15,000-$75,000, depending on slab elevation, soil compaction, and whether a stem-wall foundation is required.

How we do it

We pull the elevation certificate, set the finished floor height with the flood-zone freeboard, then excavate, compact, and pour a slab that meets Broward County’s wind and flood codes.

Electrical Panel Upgrade

Signs you need it

Your main service is a 100-amp panel from the original build, or you’re adding a full kitchen, laundry, and HVAC load for a second dwelling.

What it costs in Pompano Beach

An electrical panel upgrade or new subpanel for a Pompano Beach ADU typically runs $3,500-$12,000, including the service disconnect, grounding, and city inspection.

How we do it

We calculate the new load, pull an electrical permit, replace or refeed the panel, and coordinate the utility reconnect so the ADU has its own breaker space from day one.

Plumbing Lateral

Signs you need it

Your existing sewer lateral is a 1950s-era clay or cast-iron line, or the city’s point-of-connection review shows the lateral can’t handle the ADU’s added flow.

What it costs in Pompano Beach

A plumbing lateral replacement or new sewer connection in Pompano Beach typically runs $5,000-$25,000, depending on trench length, depth, and whether the lateral crosses a public right-of-way.

How we do it

We camera the existing line, quantify the added fixture units, then either line and conserve the lateral or trench a new one to the city connection, inspected and buried.

What ADU Site Prep & Utilities Costs in Pompano Beach

Item Typical range in Pompano Beach
Foundation, grading & stem wall $15,000-$75,000
Electrical panel upgrade & subpanel $3,500-$12,000
Plumbing lateral & sewer connection $5,000-$25,000

Will my Pompano Beach ADU need a raised foundation if I’m not on the water?

You might. Because Pompano Beach sits at low elevation with the Intracoastal running through the center, many interior parcels west of US-1 fall inside FEMA AE flood zones. A raised slab or stem wall is often required before the city issues permits. Call (971) 497-2402 for a flood-zone check on your parcel.

Can the existing electrical panel handle an ADU in Pompano Beach?

Rarely, on a 1950s or 1960s CBS home with a 100-amp panel. A full ADU kitchen, HVAC, and laundry load usually triggers a service upgrade, which we scope and price in the written estimate up front. Call (971) 497-2402 for a load review.

Brands We Service in Pompano Beach

Architect sketching an ADU floor plan for design and permitting
Brands We Service in Pompano Beach

We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and Mighty Buildings within Pompano Beach permitting constraints. Panelized and factory-built envelopes can shorten on-site framing time, but the HVHZ wind-load detailing and flood-zone foundation design still require local engineering. See our brands page for what each system handles.

Pricing for ADU in Pompano Beach, FL

Service Typical range in Pompano Beach
Site assessment, survey & elevation certificate $800-$4,500
ADU design, blueprints & structural engineering $4,000-$25,000
Permit application & city coordination $1,500-$8,500
Interior JADU conversion $40,000-$135,000
Room-to-ADU conversion with kitchenette $40,000-$135,000
Attached addition ADU $150,000-$350,000
Foundation, grading & stem wall $15,000-$75,000
Electrical panel upgrade & subpanel $3,500-$12,000
Plumbing lateral & sewer connection $5,000-$25,000

The two big price movers in Pompano Beach are flood-zone elevation requirements and the High-Velocity Hurricane Zone wind-load details on every opening and roof connection. Both are knowable before design starts, which is why we put a written price in front of you before any work begins, per Clause 1 of The Haven Standard.

Neighborhoods We Serve in Pompano Beach

Contractor spraying sealant during professional garage conversion into an ADU.
Neighborhoods We Serve in Pompano Beach

We work across Pompano Beach’s single-family neighborhoods, from the CBS ranch blocks west of US-1 to the newer parcels on the city’s north and west edges. Local scheduling runs on written scope approvals and permit readiness, not on queue-jumping.

  • Collier City
  • Pompano Beach Highlands
  • Cresthaven
  • Garden Isles
  • Kendall Green

Service Area - Cities Near Pompano Beach

For homeowners just outside the Pompano Beach limits, we also serve Margate, FL, Fort Lauderdale, FL, Plantation, FL, and Boca Raton, FL. The permitting authority and flood maps change at each city line, so we verify the local rules before quoting any work in those areas.

Serving Pompano Beach, FL - Our Local Coverage Area

Professional contractor applying spray foam insulation during a garage conversion project
Serving Pompano Beach, FL - Our Local Coverage Area

We’re based in the Pompano Beach area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Pompano Beach

Ready to get started? Free estimates · Written quotes before work starts response in Pompano Beach
Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Pompano Beach Customers Say

★★★★★ 4.8 from 6+ reviews

"Handled the whole planning process. We went to one hearing and that was it."

- Rowena C.

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

How It Works in Pompano Beach

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Pompano Beach - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Pompano Beach - we'll get back to you fast. No obligation.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Call Now - Fast Dispatch
Areas We Serve
Call Now - Fast Dispatch