Ellery ADU Studio adu team

Garage Conversion ADU in Santa Monica - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates

ADU in Santa Monica, CA

ADU design and permitting in Santa Monica means navigating two regulatory layers most Los Angeles County builders never touch: the city’s 1979 Rent Control Charter Amendment and, for a large share of residential parcels, the California Coastal Commission. A new detached or garage-conversion ADU is exempt from rent control under state law, which makes it the only path for a Santa Monica property owner to add a market-rate unit to a rent-controlled property. Most homes here are 1920s-1950s bungalows and Spanish Colonial Revival cottages on narrow 50×150 ft lots, so the dominant project types are alley-facing garage conversions and interior JADUs rather than ground-up builds. Call (971) 497-2402 for a written price before any work starts.

Call (971) 497-2402

Why Santa Monica Homes Are Different

Santa Monica’s residential fabric is heavily 1920s-1950s bungalows and Spanish Colonial Revival cottages, especially in Ocean Park and the Pico neighborhood. Most sit on narrow lots, commonly 50×150 ft, with detached single-car garages accessed via rear alleys. That geometry makes alley-facing garage conversions the dominant ADU typology here, because the garage already has a rear setback that works, the alley access is defined, and the lot rarely has room for a new detached structure without eating the yard.

The marine layer and salt-laden air within a half-mile of the shoreline accelerate corrosion on exposed fasteners, flashing, and outdoor mini-split condenser units. That’s a real materials-spec concern for Coastal Zone ADUs that doesn’t apply to work in inland San Fernando Valley cities. We specify stainless or coated fasteners and coastal-rated flashing as standard for Ocean Park and Sunset Park jobs, not as an upgrade.

The permitting path is also different here. Santa Monica’s Coastal Zone extends well inland in places, and a Coastal Development Permit adds months to the approval timeline. Many ADU specialists based in the broader LA market discover this only after city planning flags it mid-application. We plan for it from the first site assessment.

Our Main Santa Monica Services

Two service types dominate Santa Monica ADU work: garage conversions that reuse the existing alley-facing structure, and new detached ADUs on lots that can fit them. Both require the same Coastal Zone and rent-control awareness, but the construction path is different.

Garage Conversion ADU in Santa Monica

In Santa Monica, the detached single-car garage at the rear of a 50×150 lot is often the most buildable square footage on the property. A Garage Conversion ADU in Santa Monica reuses the foundation, walls, and roofline where they’re sound, then adds insulation, a new electrical subpanel, plumbing for a kitchen or bath, and windows on the alley side. On Ocean Park blocks where the garage opens to the alley, the conversion can keep the alley-facing entry, which preserves yard space and keeps the streetscape intact. The coastal air means any steel lintel or anchor we expose gets inspected for corrosion before we build over it.

Garage Conversion ADU in Santa Monica

New Detached ADU in Santa Monica

Lots in Santa Monica are narrow, but a new detached ADU still works on parcels where the setback allows a compact footprint. A New Detached ADU in Santa Monica starts with a survey and Coastal Zone check, then moves into foundation, framing, utility runs, and finish work under one contract. On a 50×150 lot, we typically place the new structure at the rear or mid-yard to preserve usable outdoor space. The coastal salt exposure shapes our exterior spec: stainless fasteners, coastal flashing, and a mini-split condenser with a corrosion-rated coil.

New Detached ADU in Santa Monica
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - you reach a local pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched.
  3. 3
    A background-checked tech heads outLicensed & insured, dispatched right away.
  4. 4
    You approve before work beginsNothing starts until you say go.

ADU Design & Permitting in Santa Monica

Professionals reviewing ADU architectural blueprints and permitting documentation outdoors
ADU Design & Permitting in Santa Monica

A design-build studio like ADU Design & Permitting changes the Santa Monica timeline. Here, a Coastal Development Permit often runs parallel to city plan check, and a permit set that doesn’t anticipate Coastal Commission review gets bounced back for revisions. We prepare the drawings, the Coastal analysis, and the city submittal as one package so the two reviews don’t fight each other. That’s the core of our work: a permit set that’s built to pass Santa Monica’s layered review the first time.

Site Assessment

Signs you need it

You’re not sure whether your parcel is inside the Coastal Zone or whether the existing garage slab can carry a conversion.

What it costs in Santa Monica

A thorough Santa Monica site assessment with utility and slab evaluation typically runs $450-$900, credited toward the full design contract if you proceed.

How we do it

We survey the lot lines, check the Coastal Zone overlay, measure the existing foundation, and test the panel and sewer lateral, then hand you a written findings report with a photo record.

ADU Design & Blueprints

Signs you need it

You have a floor plan in mind but no permit-ready drawings, or a draft plan that hasn’t been through coastal and Title 24 review.

What it costs in Santa Monica

Full ADU design with permit-ready blueprints in Santa Monica typically ranges $6,000-$14,000 depending on whether the Coastal Development Permit is triggered.

How we do it

We draft the as-built, design the floor plan and elevations, run the Title 24 energy model, and prepare the Coastal analysis if required, then assemble the complete submittal set.

Permit Application

Signs you need it

You’ve had a set of plans rejected once already, or you want someone else to sit through the Coastal Commission comment cycle.

What it costs in Santa Monica

Santa Monica permit application management, separate from city fees, typically runs $3,500-$7,000 including all plan-check resubmittals.

How we do it

We file the full set with the city, track the plan-check comments, answer the Coastal Commission’s questions in writing, and keep the resubmittal queue moving until the permit is issued.

What ADU Design & Permitting Costs in Santa Monica

Item Typical range in Santa Monica
Site assessment with utility and slab evaluation $450-$900
Full ADU design and permit-ready blueprints $6,000-$14,000
Permit application management with resubmittals $3,500-$7,000

Does every Santa Monica ADU need a Coastal Development Permit?

No. Only parcels inside the Coastal Zone need one, but the boundary extends well inland in places. We confirm your parcel’s status during the site assessment, before any drawings are started.

How long does the permit phase take in Santa Monica?

Plan check runs 4-8 weeks for standard projects; Coastal Zone projects typically add 2-4 months for the Coastal Commission review. We track both reviews in parallel where the city allows it. Call (971) 497-2402 for an exact timeline once we’ve seen your parcel.

Junior ADU & Interior Conversion in Santa Monica

Technician installing HVAC system during a professional garage conversion ADU project
Junior ADU & Interior Conversion in Santa Monica

On Santa Monica’s narrow 50×150 lots, the most economical ADU is often already inside the house. A Junior ADU & Interior Conversion converts a finished bedroom, a partial basement, or an attached garage bay into a rentable unit with its own kitchenette, bath, and entrance, usually under 500 square feet. That fits the city’s 1920s-1950s bungalow stock well, because those homes tend to have underused service rooms and rear entries that separate cleanly from the main living space.

Interior JADU

Signs you need it

You have a ground-floor bedroom or family room with its own exterior door and a bath nearby that could split off legally.

What it costs in Santa Monica

An interior JADU conversion in Santa Monica typically runs $55,000-$80,000 for a 350-500 sq ft unit with kitchenette, bath, and separate entrance.

How we do it

We separate the unit with a code-compliant wall and door, add the kitchenette and bath, run a dedicated electrical circuit, and convert one window to an egress-legal opening if required.

Room-to-ADU Conversion

Signs you need it

You have an attached addition or rear room that shares the main house’s roofline but could support its own unit designation.

What it costs in Santa Monica

A room-to-ADU conversion in Santa Monica typically falls between $70,000 and $110,000 depending on how much pipe and framing we have to move.

How we do it

We reclassify the space under the city’s ADU ordinance, add a separate entrance or convert an existing one, run plumbing for the kitchenette and bath, and bring the electrical service up to the unit’s load.

What Junior ADU & Interior Conversion Costs in Santa Monica

Item Typical range in Santa Monica
Interior JADU conversion, 350-500 sq ft $55,000-$80,000
Room-to-ADU conversion with plumbing and entrance work $70,000-$110,000
Above-garage ADU conversion $120,000-$180,000

Does a JADU have to share the main house’s address?

Yes, a Junior ADU is attached to or inside the main home and shares its address and utility service, though it gets its own entrance, kitchenette, and bath. It cannot be sold separately.

Can I rent a JADU in Santa Monica?

Yes. Under state law, JADUs are exempt from Santa Monica’s rent control ordinance, so you can rent the unit at market rate even if the main house is under rent control. Call (971) 497-2402 for an exact quote on your floor plan.

Get the price in writing before anything starts.Serving Santa Monica - a real person answers, day or night.
Call now

ADU Site Prep & Utilities in Santa Monica

Architect sketching custom ADU floor plan on grid paper for permitting
ADU Site Prep & Utilities in Santa Monica

Santa Monica’s older housing stock means site prep and utility work is rarely straightforward. The 1920s-1950s bungalows in Ocean Park and the Pico neighborhood often have electrical panels at or near capacity, sewer laterals that predate modern plumbing codes, and slabs that were poured before current foundation standards. The coastal salt air also corrodes exposed conduit and meter boxes faster than inland. ADU Site Prep & Utilities covers all of this under the same design-build contract, so the panel upgrade, the sewer lateral, and the foundation work are priced and scheduled together rather than as change orders.

Foundation & Grading

Signs you need it

Your existing garage slab is cracked, unpermitted, or too thin to carry a converted living space.

What it costs in Santa Monica

Foundation work for an ADU in Santa Monica typically runs $15,000-$35,000 depending on whether we repair the existing slab or pour new footings and a new slab.

How we do it

We core or test the existing slab, grade the site for drainage, and either reinforce the slab or excavate and pour new footings per the permit set.

Electrical Panel Upgrade

Signs you need it

Your main panel is 100 amps or less and you’re adding a kitchen, mini-split, and laundry to the ADU load.

What it costs in Santa Monica

An electrical panel upgrade to 200 amps in Santa Monica typically ranges $3,000-$6,000, with the coastal corrosion factor pushing some meter-box replacements higher.

How we do it

We replace the main panel, run a dedicated subpanel to the ADU, and install a corrosion-rated meter enclosure if the existing one is pitted from the marine layer.

What ADU Site Prep & Utilities Costs in Santa Monica

Item Typical range in Santa Monica
Foundation and grading for a detached or converted ADU $15,000-$35,000
Electrical panel upgrade to 200 amps $3,000-$6,000
Plumbing lateral replacement or extension $6,000-$12,000

Do I need a panel upgrade for a JADU that shares the main house’s service?

Often yes, because a JADU’s kitchenette, bath, and mini-split add load to a panel that was sized for a 1950s bungalow. We calculate the load during the site assessment.

Can you handle the sewer lateral if the city requires it?

Yes, we pull the lateral permit, excavate or line the existing line, and install or connect the new ADU waste line. Santa Monica often requires a lateral inspection at the point of sale or permit, and we handle that as part of the job. Call (971) 497-2402 for a written line-item quote.

Brands We Service in Santa Monica

Architect sketching an ADU floor plan for design and permitting
Brands We Service in Santa Monica

We specify and coordinate our brands within the same single contract, including Abodu, Cover, and Mighty Buildings for prefab and modular ADU systems. For Santa Monica’s coastal lots, we review the system’s exterior fastening and flashing spec before we commit to it, because the marine layer finds weak steel in a year. Parts and panels are ordered to our Los Angeles office and delivered to your Santa Monica site on the day the crew needs them.

Pricing for ADU in Santa Monica, CA

Service Typical range in Santa Monica
Site assessment with utility and slab evaluation $450-$900
Full ADU design and permit-ready blueprints $6,000-$14,000
Permit application management with resubmittals $3,500-$7,000
Interior JADU conversion, 350-500 sq ft $55,000-$80,000
Room-to-ADU conversion $70,000-$110,000
Above-garage ADU conversion $120,000-$180,000
Foundation and grading $15,000-$35,000
Electrical panel upgrade to 200 amps $3,000-$6,000
Plumbing lateral replacement or extension $6,000-$12,000

In Santa Monica, the two things that push price up fastest are Coastal Zone review adding a Coastal Development Permit to the timeline, and foundation or lateral surprises on a 1920s-1950s lot. Under Haven Standard Clause 1, every price above is written down before work starts, and under Clause 5, the scope is locked at signing so the price doesn’t move when the site surprises us.

Neighborhoods We Serve in Santa Monica

Contractor spraying sealant during professional garage conversion into an ADU.
Neighborhoods We Serve in Santa Monica

We work across the full Santa Monica footprint, from the coastal blocks of Ocean Park to the inland streets off Pico Boulevard, and from Sunset Park up to the Wilshire corridor. Most projects start with a free site visit and written assessment.

  • Ocean Park
  • Sunset Park
  • Pico neighborhood
  • Wilshire-Montana
  • Mid-City Santa Monica

Response time for a written estimate in the Santa Monica area is typically within a few days of the site visit, because our crews are scheduled from the Los Angeles office and serve Santa Monica locally.

Service Area - Cities Near Santa Monica

We also work in the neighboring coastal and westside cities where the housing stock and permit realities differ. Venice, CA shares the coastal air and alley-garage pattern. Culver City, CA has its own ADU ordinance and no Coastal Zone overlay. Beverly Hills, CA and West Hollywood, CA each have their own rent-control and planning rules. Call us for any of those areas and we’ll confirm coverage on the first call.

Serving Santa Monica, CA - Our Local Coverage Area

Professional contractor applying spray foam insulation during a garage conversion project
Serving Santa Monica, CA - Our Local Coverage Area

We’re based in the Santa Monica area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Santa Monica

Do you handle the Coastal Development Permit for Santa Monica projects?

Yes, we prepare the Coastal analysis, the visual-resource and coastal-access findings, and the city submittal as one package. Our permit team answers the Coastal Commission’s comments in writing and tracks the review cycle until the permit clears. Call (971) 497-2402 for a free written estimate on your project.

Ready to get started? Free estimates · Written quotes before work starts response in Santa Monica
Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees - talk to a local adu pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you - the visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Santa Monica Customers Say

★★★★★ 4.8 from 6+ reviews

"Every allowance was itemised at the start, so the finish selections did not turn into a surprise at the end."

- Benedict H.

"Handled the whole planning process. We went to one hearing and that was it."

- Rowena C.

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

How It Works in Santa Monica

Getting your adu handled is simple and fast.

1

Call or Request a Free Estimate

Tell us about your adu needs and we provide an upfront, transparent quote - no obligation, no hidden fees.

2

Licensed Technician Dispatched

A background-checked, certified technician arrives in Santa Monica - typically within 30-60 minutes, with parts stocked on the truck.

3

Problem Solved, Guaranteed

We complete the job to your full satisfaction, backed by our warranty and 100% satisfaction guarantee.

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Santa Monica - we'll get back to you fast. No obligation.

When you send us your details, you accept our Privacy Policy and consent to receive communications by phone, text, or email regarding your service needs, including from the affiliated professionals who may take on the job.

Prefer to text? Text Now
Call Now - Fast Dispatch
Areas We Serve
Call Now - Fast Dispatch