A quiet residential street with a new ADU behind one of the homes
Union City, CA

Garage Conversion ADU in Union City - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A former garage converted into a guest house
A bedroom and desk inside a converted garage
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU in Union City, CA

An ADU in Union City, CA usually starts with the permit set, not a construction crew: the city’s 1970s and 1980s tract housing stock, slab-on-grade foundations, and tight rear setbacks mean the design and permitting phase determines whether a project is even buildable. Most Union City homeowners we work with are adding an in-law unit for multigenerational family, not a rental. Call (971) 497-2402 and we’ll walk you through the written price, the permit timeline, and the specific conditions your lot faces.

Call (971) 497-2402

Why Union City Homes Are Different

Union City’s housing stock creates a specific pattern: roughly 5,000 to 6,000 square foot lots, slab-on-grade construction, and 1970s or 1980s single-family tract homes. The typical garage conversion here involves an uninsulated concrete floor sitting in a marine humidity corridor, and moisture migrating through that slab is one of the first things our design review catches. Vapor barrier and mechanical ventilation are not optional add-ons in this climate; they’re baked into the plan set before permits are filed.

You’ll see the same pattern in older pockets near the historic Alvarado district, where pre-1960s homes on crawl spaces often carry electrical panels from a different era. Any ADU that shares power with the main house in Union City will likely trigger a panel upgrade as a condition of final inspection. And because Union City sits near the southern reach of the Hayward Fault, Alameda County plan checkers routinely flag detached ADU foundations for seismic adequacy review. That adds design review time and cost that surprises homeowners whose only comparison is an inland permit timeline.

One more Union City-specific reality: those 1970s subdivisions are full of informal patio covers, trellis structures, and storage sheds that were built without permits. Since rear setbacks on these narrow lots are already tight, the first step on many detached ADU jobs is demolishing or legalizing an existing structure before the new footprint can fit. City Hall permit techs flag this at intake almost automatically. We plan for it in the site assessment, not after the permit is rejected.

Our Main Union City Services

Union City homeowners most often call us about two ADU paths: converting a two-car garage that already has a slab in place, or building a new detached unit in a rear yard where an unpermitted structure often has to come out first. Both start with the same written-price design-build contract in Union City.

Garage Conversion ADU in Union City

A garage conversion in Union City means working with a 1970s or 1980s slab-on-grade floor, and the marine humidity off the bay makes moisture management the central design problem. We spec vapor barrier and ventilation in the permit set, not as an afterthought. Read the full breakdown at Garage Conversion ADU in Union City.

Garage Conversion ADU in Union City

New Detached ADU in Union City

Building a detached ADU in Union City means checking rear setback depth early, because the unpermitted patio cover or storage shed that’s been there for twenty years often has to be removed before the new footprint is legal. Seismic review also adds a layer to the foundation design. See how we handle both at New Detached ADU in Union City.

New Detached ADU in Union City
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

ADU Design & Permitting in Union City

ADU plans, samples and a small model on a desk

ADU Design & Permitting in Union City is where a project either gets approved or stalls for six months. The city’s tract-home lots, marine humidity, and seismic review requirements mean the drawings have to account for moisture, setbacks, and foundation adequacy before the first permit is filed. Most Union City properties also carry a 100-amp panel from the original build, which means the plan set has to include a panel upgrade if the ADU will share power. We produce the full ADU Design & Permitting package under one written price: site assessment, drawings, structural engineering, Title 24 energy compliance, and permit filing, with a documented photo record at every step.

Site Assessment

Signs you need it

If you have an old patio cover or shed in the rear setback, a slab you’re not sure about, or a 1970s panel, the site assessment catches these before they become a permit rejection.

What it costs in Union City

Site assessment in Union City typically runs $500 to $1,500, depending on lot complexity and whether as-built records exist.

How we do it

We measure the lot, photograph the existing structures and panel, check current utility laterals, and give you a written document of what we found, then quote the design and permit work as a fixed price.

ADU Design & Blueprints

Signs you need it

If you need a permit-ready drawing set that addresses Union City’s setbacks, seismic review, and ventilation requirements, this is the stage where the unit is actually designed.

What it costs in Union City

Architectural and structural drawings for an ADU in Union City typically run $8,000 to $20,000, depending on whether it’s a conversion or new detached unit.

How we do it

Permit Application

Signs you need it

If you want a permit set that survives Alameda County plan check without three rounds of corrections, we handle submission, tracking, and responses to the plan checker.

What it costs in Union City

Permit application and management typically runs $2,500 to $6,000 in Union City, including city filing fees and plan check response time.

How we do it

We file the drawings, track the review, answer plan check comments in writing, and bring you a stamped permit set that matches what will actually be built.

HOA & Zoning Compliance

Signs you need it

If your Union City property is in an HOA or has setback questions, a zoning review before the permit application prevents a rejected filing and wasted months.

What it costs in Union City

Zoning and HOA compliance review typically runs $1,000 to $2,500 as part of the design phase in Union City.

How we do it

We check the zoning ordinance against your lot, flag any setback variance, and prepare the paperwork that addresses HOA requirements in writing.

What ADU Design & Permitting Costs in Union City

Item Typical range in Union City
Site assessment $500 - $1,500
ADU design & blueprints $8,000 - $20,000
Permit application & management $2,500 - $6,000

Does Union City require a panel upgrade for an ADU permit?

Many Union City homes, especially 1970s and 1980s tract houses, still run 100-amp panels, and Alameda County plan checkers will flag the panel if the ADU shares power. Our design package includes the panel scope in the written price so it’s not a surprise at final inspection. Call (971) 497-2402 for an exact review of your panel.

Will the permit process delay my ADU because of the Hayward Fault?

Detached ADUs in Union City frequently get flagged for seismic adequacy review, which adds design time but not necessarily budget if the foundation is engineered from the start. We include structural engineering in the permit set up front. Call (971) 497-2402 and we’ll tell you what your lot triggers.

Junior ADU & Interior Conversion in Union City

The private side entrance of a junior ADU

Junior ADU and interior conversion work in Union City means turning existing square footage, typically a primary bedroom suite or a basement, into a self-contained unit with its own entrance, kitchenette, and bath, all without changing the building footprint. That is the fastest permitted path in Union City, and it is especially common in multigenerational homes where a parent moves into a converted primary suite. We handle the full Junior ADU & Interior Conversion scope under one written price, including the separate entrance, egress, and the kitchenette that state law requires for a JADU.

Room-to-ADU Conversion

Signs you need it

If you have a large primary suite or a finished room with plumbing on the far side of the house, you can convert it into a JADU without adding square footage.

What it costs in Union City

Room-to-ADU conversions in Union City typically run $60,000 to $120,000 depending on plumbing location and finish level.

How we do it

We add the separate entrance or interior access, run the kitchenette plumbing and electrical, and produce a permit set that passes final inspection.

Interior JADU

Signs you need it

If Union City’s setback rules make a detached ADU unworkable on your narrow lot, an interior JADU inside the existing footprint avoids the yard entirely.

What it costs in Union City

An interior JADU in Union City typically runs $80,000 to $150,000, including the efficiency kitchen and separate entrance.

How we do it

We design the conversion, file the permit, run mechanical and electrical, and document every phase with a photo record you receive after each visit.

What Junior ADU & Interior Conversion Costs in Union City

Item Typical range in Union City
Room-to-ADU conversion $60,000 - $120,000
Interior JADU $80,000 - $150,000
Above-garage ADU $150,000 - $250,000

Will adding a JADU in Union City trigger a panel upgrade?

Yes, in most cases a JADU that shares the main house’s panel will require a 100-amp to 200-amp upgrade if the panel is original to a 1970s or 1980s home. We quote the panel upgrade in the written price before work starts. Call (971) 497-2402 to get a clear answer on your panel.

Can a JADU be built inside a 1970s Union City tract home without moving walls?

Mostly yes. Interior JADU conversions work within existing bedrooms and finished spaces, so the exterior walls and rooflines don’t change, which keeps the permit simpler. Moisture management still matters here because of the bay humidity. Call (971) 497-2402 and we’ll assess your floor plan.

ADU Site Prep & Utilities in Union City

A utility trench with new sewer pipe and conduit

ADU Site Prep & Utilities in Union City is where slab issues, panel upgrades, plumbing laterals, and gas lines get built out, and it’s the work that makes or breaks a final inspection. Union City’s marine humidity and the city’s older subdivisions mean we are nearly always addressing a sloping lot, an unpermitted patio cover in the rear setback, or a 100-amp panel before the ADU shell can even start. The full ADU Site Prep & Utilities scope is under the same written price as the drawings, so the foundation and utilities are already accounted for before the permit is filed.

Foundation & Grading

Signs you need it

If your Union City lot slopes toward the house or has an old concrete slab from a torn-down shed, you’ll need grading and possibly a new foundation before the ADU footprint can work.

What it costs in Union City

Foundation and grading for an ADU in Union City typically runs $15,000 to $40,000 depending on slope and seismic requirements.

How we do it

We cut or build up grade, install drainage, pour the slab or footings, and produce the photo documentation Alameda County wants at inspection.

Electrical Panel Upgrade

Signs you need it

If your Union City home has a 100-amp panel from the 1970s or 1980s and the ADU will share power, the panel upgrade is mandatory, not optional.

What it costs in Union City

A panel upgrade to 200 amps in Union City typically runs $3,000 to $6,000, depending on the existing panel and utility lateral.

How we do it

We replace the panel, run the new feeder to the ADU, and coordinate the utility shutoff and inspection with Pacific Gas and Electric.

What ADU Site Prep & Utilities Costs in Union City

Item Typical range in Union City
Foundation & grading $15,000 - $40,000
Electrical panel upgrade $3,000 - $6,000
Plumbing lateral & gas line $5,000 - $15,000

Does Union City require a vapor barrier under an ADU slab?

Yes. Because Union City sits in a bay humidity corridor, Alameda County plan checkers and our own standard require a vapor barrier under any new ADU slab, and mechanical ventilation in the unit. That’s in the written price from the beginning. Call (971) 497-2402 for the exact scope.

Will the unpermitted shed in my Union City backyard block my ADU permit?

Usually it has to be demolished or legalized before the ADU footprint can be approved, because rear setbacks on these narrow lots are already tight. We include demolition or removal in the site prep scope so it’s not a surprise later. Call (971) 497-2402 and we’ll check your lot by address.

Brands We Service in Union City

We specify and coordinate Abodu, Cover, and Dvele systems within the same single-contract design-build process in Union City. Panels and connection details are ordered through our Bay Area suppliers and delivered to your site on the construction schedule. Visit our brands for the full list and what each system includes.

Pricing for ADU in Union City, CA

Service Typical range in Union City
Site assessment $500 - $1,500
ADU design & blueprints $8,000 - $20,000
Permit application & management $2,500 - $6,000
HOA & zoning compliance $1,000 - $2,500
Room-to-ADU conversion $60,000 - $120,000
Interior JADU $80,000 - $150,000
Above-garage ADU $150,000 - $250,000
Foundation & grading $15,000 - $40,000
Electrical panel upgrade $3,000 - $6,000
Plumbing lateral & gas line $5,000 - $15,000

What pushes the price up in Union City is the panel upgrade on 1970s and 1980s homes, seismic foundation review for detached units, and demolition of unpermitted patio covers or sheds in tight rear setbacks. Every project gets a written price before any work begins, per Haven Standard Clause 1, so these line items are visible up front and never arrive as a surprise change order.

Neighborhoods We Serve in Union City

We work across Union City’s 1970s and 1980s subdivisions and the older pockets around Alvarado. Response time for site assessments in Union City is typically within a few business days, and the written price follows the site visit.

  • Alvarado
  • Decoto
  • Seven Hills
  • Dowe Avenue area
  • Contempo Homes

Service Area - Cities Near Union City

Our design-build team also serves homeowners in neighboring cities including Fremont, CA, Newark, CA, Castro Valley, CA, and Hayward, CA. Each city has its own permit quirks, and we handle the local filings, not just the construction.

Serving Union City, CA - Our Local Coverage Area

We’re serving the Union City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Union City

Ready to get started? Free estimates in Union City
Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Union City Customers Say

★★★★★ 4.8 from 6+ reviews

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

How It Works in Union City

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A kitchenette inside a converted garageA new bathroom inside a converted garageAn attached garage converted into living spaceAn efficiency kitchen in a junior ADUA new two-story ADU over a garageA compact kitchen inside a new ADU

More ADU services in Union City

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Union City. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch