A quiet residential street with a new ADU behind one of the homes
Studio City, CA

Garage Conversion ADU in Studio City - Plans, Permits & Build, One Fixed Price

We handle the design, the engineering, and the city permit, then build it. One contract, one crew, one accountable point of contact. Free feasibility check on your lot before you commit.

✓ Licensed & Insured ✓ Written quotes ✓ Permits handled
Schedule Free Estimate

Call to schedule your free estimate

Work is performed by our local vetted partner.

Work is performed by our local vetted partner.

Free Estimate on SiteCalls Answered by a Live Person, 24/7Background-Checked TechniciansOur technicians have up to 11 years of experience
🛡 Licensed & Insured 📝 Written Fixed-Price Quotes 💲 No Change Orders · Free Estimates
A kitchenette inside a converted garage
A new bathroom inside a converted garage
A new modern ADU with wood cladding
The bedroom inside a new ADU
The bathroom inside a new ADU
A small deck outside a new ADU
The sitting area and efficiency kitchen of a junior ADU
The living room inside a new ADU
Every project starts with

A free site visit, a check of what your lot allows and a written, line-item price.

Get your free estimate

ADU in Studio City, CA

An ADU in Studio City, CA starts with the permit set, and the permit set starts with one question: does your parcel sit inside the Very High Fire Hazard Severity Zone? That single designation, which follows the hillsides north of Ventura Boulevard toward Fryman and Coldwater Canyons, changes your wall assemblies, your venting, your roofing, and your budget by $20,000 to $40,000 before a single drawing is stamped. Most Studio City homeowners discover this when the plan checker flags it, not when the estimate is written, which is why our design and permitting work here always begins with the LA hazard map, not the floor plan. Call (971) 497-2402 and we’ll run your address through it while you’re on the phone.

Call (971) 497-2402

Why Studio City Homes Are Different

Studio City’s valley floor is a landscape of 1940s and 1960s California ranch homes and post-war tract houses sitting on 6,000 to 10,000 square foot lots, many with detached single-car garages that read as obvious ADU conversions on paper and reveal their age in the field. The original 100-amp electrical panels and cast-iron sewer laterals in these homes were sized for a family with a single television and a window air conditioner, not a dwelling unit with a mini-split, an induction cooktop, and a washer-dryer. In the hills above Ventura Boulevard, the terrain adds another layer entirely: steep-slope foundations commonly require caissons or pier-and-beam engineering, which moves the cost profile well beyond a flat-lot garage conversion two blocks south. And the heat here is real. Studio City sits in the inland San Fernando Valley, where summer highs routinely pass 100°F, and an ADU HVAC system spec’d for Santa Monica will be chronically undersized by August. None of this makes an ADU impossible in Studio City. It makes the sequencing of the work, and the accuracy of the written scope, the difference between a permit that closes and a permit that stalls.

Our Main Studio City Services

Most Studio City homeowners we meet are weighing two paths: convert what they already have or build new in the rear yard. Both are governed by the same LA ADU ordinance, but the cost drivers, timeline, and site conditions differ enough that each deserves its own page.

Garage Conversion ADU in Studio City

Studio City’s oldest lots were platted with detached single-car garages that now sit underused or as storage. A garage conversion turns that existing footprint into a permitted dwelling unit, often without the setback fights a new structure can trigger. The condition of the existing slab and the run from the main panel to the garage are the two numbers that determine whether this is a straightforward conversion or a larger job. If you already have a written estimate from another contractor, our free second opinion will tell you whether the scope they priced is the scope the city will actually approve. This is one of the two Garage Conversion ADU in Studio City paths we walk clients through most often.

Garage Conversion ADU in Studio City

New Detached ADU in Studio City

New detached ADUs on Studio City lots are governed by a state and city framework that is now, frankly, favorable to owners: parking requirements are relaxed, setbacks are reduced, and the maximum square footage is set by lot size rather than neighbor input. On the valley floor, a new detached ADU is often a simpler engineering problem than a conversion of a 1960s garage with a slab of unknown depth. On hillside parcels, the foundation becomes the conversation. We recommend reading the full New Detached ADU in Studio City breakdown before deciding which path fits your lot.

New Detached ADU in Studio City
Need help today?Fast, friendly service and a no-obligation free estimate.

Call (971) 497-2402

ADU Design & Permitting in Studio City

ADU plans, samples and a small model on a desk

Design and permitting is where a Studio City ADU either gets built on time or becomes a two-year story told at dinner parties. The homes here, most built between 1940 and 1970, were never drawn with accessory dwellings in mind, and the gap between what the county assessor recorded and what the city will approve as a permit set is where most budgets break. We produce the full permit set, the documentation bundle, and the written scope under one contract, and every line item is priced before any drawings leave the office, per Haven Standard Clause 1. If you want to understand the full ADU Design & Permitting process, that page covers the entire sequence from site assessment through Title 24 compliance.

Site Assessment

Signs you need it

You have a parcel north of Ventura Boulevard with any slope at all, or a flat lot with a 1950s home and a sewer lateral you’ve never scoped.

What it costs in Studio City

Site assessment work in Studio City typically runs $1,800 to $4,200, including the geotech and sewer scope.

How we do it

We pull the LA hazard map overlay, order a geotech report, scope the existing sewer lateral with a camera, and document the panel and service size before any floor plan is sketched.

ADU Design & Blueprints

Signs you need it

You have a clear idea of what you want but no plan set that would survive a plan checker’s first review.

What it costs in Studio City

Full ADU design and blueprint sets in Studio City fall between $8,000 and $18,000 depending on slope and fire-zone requirements.

How we do it

We draw the full permit set, including structural, mechanical, electrical, and plumbing sheets, and note every VHFHSZ assembly requirement on the drawings themselves so the plan checker sees them addressed up front.

HOA & Zoning Compliance

Signs you need it

You’re in a hillside HOA or your lot has a recorded easement or a nonconforming setback that makes the zoning answer unclear.

What it costs in Studio City

Zoning and HOA compliance review in Studio City typically costs $1,200 to $3,500 as a distinct line item.

How we do it

We verify the parcel against LA’s current ADU ordinance, confirm HOA bylaws don’t conflict with state ADU law, and document every compliance letter in the permit file.

What ADU Design & Permitting Costs in Studio City

Item Typical range in Studio City
Full design and permitting, flat lot $12,000 - $22,000
Full design and permitting, hillside / VHFHSZ $18,000 - $35,000
Fire-hardening upgrades (walls, vents, roof) $20,000 - $40,000

Can I get a permit on a Studio City hillside lot without fire-hardening?

No. If your parcel falls inside the VHFHSZ, the ignition-resistant wall assemblies, ember-resistant vents, and Class A roof are minimum permit requirements, not optional upgrades. Call (971) 497-2402 and we’ll check your address against the hazard map before you spend a dollar on drawings.

How long does design and permitting take in Studio City?

Plan for 4 to 7 months from first site visit to issued permit. Hillside parcels with geotech and fire-zone review run toward the long end. The written scope locks at signing, so schedule changes are the only variable.

Junior ADU & Interior Conversion in Studio City

The private side entrance of a junior ADU

A Junior ADU, or JADU, is the fastest path to a rentable or family unit in Studio City because state law caps the maximum size at 500 square feet and allows it inside the existing footprint of a single-family home. For Studio City owners with a 1940s ranch and an underused den or a garage with living space above, this is often the lowest-cost way to add a legal unit without touching the foundation. The catch in Studio City is the same one that governs every project here: the existing 100-amp panel and original sewer lateral may not support a second kitchen and bath, so the JADU conversation often becomes a panel and lateral conversation. Our full Junior ADU & Interior Conversion page covers the complete scope, but the short version is this: a JADU is a building-code project, not a furniture project, and the permit still matters.

Interior JADU

Signs you need it

You have a spare bedroom, den, or oversized attached garage space that already sits inside your home’s footprint and under your existing roof.

What it costs in Studio City

Interior JADU conversions in Studio City typically run $45,000 to $95,000 all-in, including the required separate entrance and efficiency kitchen.

How we do it

We verify ceiling heights and egress windows, design the efficiency kitchen to code, file the JADU permit, and coordinate the panel and sewer work if the site assessment calls for it.

Above-Garage ADU

Signs you need it

Your detached garage has living space above it, or a framed attic that could become one, and the garage itself stays as parking or storage.

What it costs in Studio City

An above-garage ADU in Studio City falls between $160,000 and $280,000, with hillside foundation and fire-zone requirements pushing toward the top.

How we do it

We evaluate the garage’s existing structure and slab, design the unit to meet current ceiling and stair codes, and specify fire separation between the garage below and the dwelling above.

What Junior ADU & Interior Conversion Costs in Studio City

Item Typical range in Studio City
Interior JADU conversion $45,000 - $95,000
Above-garage ADU $160,000 - $280,000
Fire-hardening upgrades where required $20,000 - $40,000

Does a JADU in Studio City need its own electrical panel?

A JADU does not require its own panel, but it commonly requires a panel upgrade on the main house. Most 1940s-to-1960s Studio City homes have 100-amp service, and a second kitchen plus mini-split will usually demand 200 amps. Call (971) 497-2402 and we’ll check your panel size before the design starts.

Can I rent out a JADU in Studio City?

Yes. A permitted JADU is a legal rental unit in Los Angeles, including Studio City. The owner-occupancy requirement applies to the main house or the JADU, not both. We document everything for the permitting file so the rental status is never in question.

ADU Site Prep & Utilities in Studio City

A utility trench with new sewer pipe and conduit

Site prep on a Studio City ADU is where the estimate meets the dirt, and the dirt here has opinions. The 1940s and 1950s homes on the valley floor often sit above cast-iron sewer laterals that were adequate when the house was built and are now either cracked, root-bound, or undersized for an added dwelling. On hillside parcels north of Ventura, the site work is a different discipline entirely: caissons or pier-and-beam foundations on steep grades, retaining walls, and drainage designed for the Santa Ana season. This is the part of the project where a written scope matters most, because every unknown underground line item is a change order waiting to happen if it was never priced. That is exactly why our ADU Site Prep & Utilities process includes a full document escalation at every visit.

Electrical Panel Upgrade

Signs you need it

Your home has a 100-amp panel, or the main service is located on the opposite side of the house from where the ADU will be built.

What it costs in Studio City

A 200-amp panel upgrade in Studio City typically runs $3,500 to $6,500, depending on the existing service location and whether trenching to the ADU is required.

How we do it

We verify the utility feed, permit the panel swap, and run a properly sized subpanel to the ADU location with documented photo evidence of the completed work.

Plumbing Lateral

Signs you need it

Your sewer lateral is original cast iron, or a camera scope shows cracks, root intrusion, or bellies that would fail a permit inspection.

What it costs in Studio City

Sewer lateral replacement in Studio City runs $8,000 to $18,000 depending on depth and street access, and it must be completed before the ADU can receive final inspection.

How we do it

We camera-scope the lateral first, get a written price for any repair or replacement, and coordinate the work with the city inspector so the ADU permit is never held up by an open sewer item.

What ADU Site Prep & Utilities Costs in Studio City

Item Typical range in Studio City
Electrical panel upgrade to 200A $3,500 - $6,500
Sewer lateral replacement $8,000 - $18,000
Foundation, grading, and hillside work $25,000 - $70,000

Do I need a panel upgrade for an ADU in Studio City?

Most Studio City homes built before 1970 have 100-amp service. Whether you need 200 amps depends on the ADU’s load, the main house’s existing draw, and the utility’s current rules. We answer that question during site assessment, in writing, before any contract is signed.

Will a cracked sewer lateral stop my ADU permit?

It can. If the city’s sewer inspection finds a failed or undersized lateral, the ADU permit will not close until it’s repaired or replaced. We scope the lateral during site assessment so this item is priced up front, not discovered at final inspection. Call (971) 497-2402 to schedule the scope.

Brands We Service in Studio City

We regularly specify and coordinate prefab and modular systems from Cover, Dvele, and Boxabl on Studio City projects. Our brands page details each system’s lead times, structural requirements, and how they fit into a single-contract design-build scope.

Pricing for ADU in Studio City, CA

Service Typical range in Studio City
Site assessment $1,800 - $4,200
ADU design and blueprints $8,000 - $18,000
HOA and zoning compliance $1,200 - $3,500
Interior JADU conversion $45,000 - $95,000
Above-garage ADU $160,000 - $280,000
Electrical panel upgrade $3,500 - $6,500
Sewer lateral replacement $8,000 - $18,000
Foundation, grading, hillside work $25,000 - $70,000
Fire-hardening upgrades $20,000 - $40,000

The two variables that push Studio City pricing above the county norm are the VHFHSZ overlay and the age of the original underground utilities. Every project we quote carries a written price before work starts, per Haven Standard Clause 1, so the number you see on the estimate is the number you’ll pay at final inspection.

Neighborhoods We Serve in Studio City

We work across the Studio City valley floor and the canyon slopes north of Ventura Boulevard alike. The local pros are on local Studio City jobs regularly, and scheduling is coordinated from the Los Angeles area.

  • Fryman Canyon Estates
  • Silver Triangle
  • Carpenter Square
  • Colfax Meadows
  • Woodbridge Park

Service Area - Cities Near Studio City

Our design-build work regularly extends to surrounding communities with similar housing stock and permitting profiles. We serve North Hollywood, CA and Universal City, CA directly, work in Van Nuys, CA on similar post-war tract lots, and handle West Hollywood, CA projects with different zoning but the same single-contract approach.

Serving Studio City, CA - Our Local Coverage Area

We’re serving the Studio City area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.

FAQs About ADU in Studio City

Ready to get started? Free estimates in Studio City
Call (971) 497-2402

What happens when you call

  1. 1
    A real person answersNo phone trees. Talk to a local ADU pro.
  2. 2
    You get an upfront price rangeHonest numbers before anyone is dispatched. No surprises.
  3. 3
    We come out and measureLicensed & insured, at a time that suits you. The visit and the quote are both free.
  4. 4
    You get the price in writingLine-itemed, yours to keep, and nothing starts until you say go.

What Studio City Customers Say

★★★★★ 4.8 from 6+ reviews

"Garage conversion finished on the drawings and close to the schedule. They were honest that the sewer connection was the unknown, and it was."

- Arjun D.

"The permit set and the build were one contract with one number. Our neighbours used two firms and spent a year watching them blame each other."

- Helena V.

"The rental income has covered the payment since the second month. They were realistic about the numbers rather than optimistic."

- Odette N.

How It Works in Studio City

Getting your ADU project started is simple.

1

Call or Request a Free Estimate

Tell us about your ADU project and we set up a free visit. No obligation and no hidden fees.

2

Licensed Estimator Visits

A licensed, insured estimator inspects and measures on site, then gives you a clear written price.

3

Scheduled and Done Right

Your crew does the work on the date in your quote, backed by our workmanship warranty and satisfaction guarantee.

Small homes that live large

Vaulted ceilings, compact kitchens and private decks: the details that make an ADU feel like a home.

Read our ADU guides
A former garage converted into a guest houseA bedroom and desk inside a converted garageAn attached garage converted into living spaceAn efficiency kitchen in a junior ADUA new two-story ADU over a garageA compact kitchen inside a new ADU

More ADU services in Studio City

Every build below starts the same way: a free site visit and a written price.

Getting started with Ellery

Every project starts with a conversation and a written price. Here is how to take the first step.

A project lead measuring a backyard ADU site with the homeowner

Free site visit

A project lead walks the lot with you, checks what it allows and hands you a written, line-item price. No obligation.

Book a site visit
A building crew carrying lumber to a backyard ADU site

Find your local team

Each location is independently owned and works to the same written standard. Enter your ZIP code to reach yours.

A worker protecting the lawn before an ADU build starts

Read our written promise

What we promise on every job, written down, with the terms spelled out before any work starts.

Our promise

Current Offers

Bring these savings to your next appointment.

Free On-Site Estimate & Written Quote

No obligation. We measure, price the job in writing, and the quote is yours to keep.

Expires Mar 31, 2027
Always

Written Price Before Any Work Starts

Expires Mar 31, 2027
Free

Free Second Opinion on Any Written Estimate

Expires Mar 31, 2027
Included

Documented Photo Record on Every Visit

Expires Mar 31, 2027

Request a Free Estimate

Tell us what's going on in Studio City. We'll get back to you fast. No obligation.

By submitting this form you agree to our Privacy Policy and consent to be contacted by phone, email or SMS about your request, including by local professionals who may handle it.

Prefer to text? Text Now
Call Now - 24/7 Dispatch
Areas We Serve
Call Now - 24/7 Dispatch