Fast, Reliable Garage Conversion ADU Across Pembroke Pines
Garage conversion ADUs in Pembroke Pines typically run $140,000-$210,000 all-in for an attached single-car conversion, drawings through final inspection. Detached conversions and larger two-car layouts can reach $260,000 or more depending on flood-plain elevation, impact-rated glazing, and the condition of the existing slab. The first step is not the design. It’s the deed review. Before any drawing gets started, our team pulls the recorded plat and the community declarations for your specific subdivision, because Pembroke Pines has some of the densest 55+ HOA coverage in Florida and many of those CC&Rs were written before anyone imagined a second unit on the lot.

For a written scope and price on your specific garage, call (971) 497-2402. We don’t give verbal ranges over the phone and then change them later. The estimate you receive is the price you sign, governed by The Haven Standard, Clause 1.
Why Ellery ADU Studio Is Pembroke Pines’s Preferred Garage Conversion ADU Company
Pembroke Pines is not a simple city to build in, and the companies that figure that out the hard way are the ones that end up in disputes. Our work here leans on a specific set of local documents: the recorded subdivision plat, the HOA declarations and amendments, the Broward County flood map panels, and the municipality’s current interpretation of Florida HB 7015. We’ve worked through enough Centuryd Village, Pembroke Falls, and SilverLakes projects to know that the private covenants matter more than the state statute in this city. A state law cannot override a recorded deed restriction, and many Pembroke Pines communities have restrictions that flatly prohibit a second dwelling unit, even one inside the existing garage footprint.
Ellery ADU Studio was founded in 2015, the year California’s ADU permitting landscape shifted, and we’ve carried that document-first culture into every South Florida project since. Nadia Ellery leads the studio, and her name goes on the permit set for every garage conversion we do in Pembroke Pines. The drawings, the permit set, and the construction are one contract at one written price. If the finished unit does not match the permitted drawings, our 365-Day Done Right Promise is in writing before the first day of demo.
Our Garage Conversion ADU Services in Pembroke Pines

Attached Garage Conversion
The most common conversion we do in Pembroke Pines, and for good reason. Attached garages sit inside the existing building envelope, which means no new setback disputes with the plat, no separate foundation work, and no fight with the HOA about whether a detached structure changes the “character” of the lot. We convert the garage into a studio or one-bedroom ADU with its own entry, kitchenette, and bath, typically keeping the front elevation largely unchanged. In communities like Pembroke Falls, we’ve widened interior doorways to 36 inches and added zero-threshold showers so the unit works for aging-in-place from day one. Attached conversions in Pembroke Pines generally run $140,000-$190,000.

Detached Garage Conversion
Detached garages in Pembroke Pines are trickier. The city’s dominant housing stock, built between the late 1970s and mid-1990s, sits on narrow lots with rear-yard setback easements recorded in the plats. A detached garage that appears to have room to grow often doesn’t, once the recorded easement lines are overlaid. When the footprint does work, we get a separate meter path, run underground utilities across the rear yard, and build the ADU within the existing garage shell. The shallow water table in parts of the city means we check the flood panel before we quote, because slab elevation or fill can add $8,000-$20,000 that a standard interior estimate wouldn’t include. Detached conversions here typically range from $180,000-$260,000.

Carport Conversion
Carports are the sleeper on this page. Many older Pembroke Pines homes, especially those built before 1985 in the western subdivisions, have a carport that’s already permitted as a covered parking structure. Enclosing a carport into an ADU requires new exterior walls, impact-rated windows, and a roof assembly that meets post-Hurricane Andrew Florida Building Code. That materials standard is genuinely more expensive than what a homeowner would pay in most other states. Carport conversions in Pembroke Pines typically run $120,000-$180,000, but the lower starting number often trips people up because they haven’t priced the glazing and roof work.

Garage Partition & Bathroom Add
Some Pembroke Pines homeowners don’t want to lose the entire garage. A partition ADU splits the existing two-car garage into two zones: a compact studio with a bathroom, and a storage or parking bay that keeps the garage door functional. The bathroom typically requires a new wet-wall run, and if the slab needs cutting for drain lines, we check the flood elevation before we quote. Partition ADUs in Pembroke Pines run $90,000-$150,000 depending on whether the existing slab can accept the drain work without fill. This option gets less attention than a full conversion, but it’s often the cleanest answer for an HOA that wants the garage door to stay in place.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Pembroke Pines
We specify and coordinate prefab and modular systems from Abodu, Cover, Dvele, and Mighty Buildings inside the same single contract that covers the site work. For Pembroke Pines specifically, we hold local inventory knowledge for impact-rated window and door packages and we coordinate the delivery and crane placement on Pembroke Pines streets with the city’s right-of-way rules in mind. A prefab panelized system can cut on-site framing time by weeks, but the permit set still has to clear the same HOA and flood-plain reviews. That’s the part we own.

Common Garage Conversion ADU Problems We See in Pembroke Pines Homes

- HOA declaration review skipped. We’ve seen contracts signed and surveys ordered before anyone read the 1980s CC&Rs. The restriction says “single-family use only,” and the HOA attorney kills the project after weeks of design work. In Pembroke Pines, this is the single most common reason a garage conversion dies before permit submission. We pull the declarations before we quote, not after.
- Detached garage quoted without checking rear-yard setbacks. Several subdivisions in Pembroke Pines have recorded setback easements that are narrower than the current code minimums. A detached conversion that looked simple on a Google Earth screenshot doesn’t fit once the plat is overlaid. We quote attached layouts first in Pembroke Pines for exactly this reason.
- Flood-plain requirements underestimated. Broward County’s water table is so shallow that scattered FEMA Special Flood Hazard Areas show up in parts of Pembroke Pines more than homeowners expect. A conversion that doesn’t account for base flood elevation can trigger a slab lift, fill, or a full rework of the foundation line. That’s thousands of dollars that never appeared in the initial “ballpark.”
- Post-Hurricane Andrew impact standards skipped in early pricing. Every new opening in a Pembroke Pines ADU must meet impact-resistant glazing and shutter requirements under the Florida Building Code. A homewyse-style national estimate won’t include it. Our written quotes always do, because we know the South Florida materials market.
Pricing for Garage Conversion ADU in Pembroke Pines, FL
What you’re really buying is a permit set and a build that survives Pembroke Pines’s document review process. Here are the ranges we’ve priced in this city, all-in with drawings, permitting, construction, and final inspection:
- Garage partition with bathroom add: $90,000-$150,000
- Carport enclosure to studio ADU: $120,000-$180,000
- Attached single-car garage conversion: $140,000-$190,000
- Attached two-car garage conversion: $190,000-$260,000
- Detached garage conversion: $180,000-$300,000
These numbers are Pembroke Pines numbers. They include the impact-rated windows, the flood-panel review, and the HOA document pull that most national estimates ignore. Under The Haven Standard, Clause 1, the price we hand you in writing is the price on the contract. No door-side upsells. No scope creep. To get the exact number for your garage and your subdivision, call (971) 497-2402 for a free written estimate.
We Also Serve Cities Near Pembroke Pines

Our crews work throughout South Florida, and we regularly run Garage Conversion ADU projects in Miami Gardens, Plantation, Hialeah, and North Miami Beach. The HOA-dense pattern you see in Pembroke Pines shows up differently in each of those cities, and the flood-plain picture shifts block by block. If you’re in a neighboring city, the same document-first process applies.
Serving Pembroke Pines, FL - Our Local Coverage Area
We’re based in the Pembroke Pines area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - Garage Conversion ADU in Pembroke Pines

Yes, in most Pembroke Pines communities you need written HOA approval before the city will accept your permit application, and in many cases the HOA’s recorded CC&Rs can prohibit a second dwelling unit outright, regardless of what Florida HB 7015 says. The state law removes municipal barriers; it does not override private deed restrictions. Our process in Pembroke Pines starts with pulling your subdivision’s recorded plat and declarations so we know whether the conversion is even legally possible before you spend a dollar on design. Call (971) 497-2402 and we’ll walk you through what your specific HOA documents say.
Yes, and this is the conversion we recommend most often in Pembroke Pines, because keeping the exterior walls and roofline unchanged removes the two biggest local obstacles: HOA architectural review disputes and new setback interpretations. We just converted a single-car attached garage in the Pembroke Falls community into a zero-threshold studio for a snowbird couple. Our crew pulled the recorded plat and HOA declarations before quoting, then widened the interior doorway to 36 inches, added blocking for grab bars in the walk-in shower, and used slip-rated porcelain tile to meet the community’s aging-in-place standards without touching the slab or changing the roofline. That project stayed entirely inside the existing envelope, and the HOA approved it in under three weeks.
Yes. Any new window, door, or roof assembly in a Pembroke Pines ADU must meet the impact-resistant requirements of the post-Hurricane Andrew Florida Building Code. That means impact-rated glazing or approved shutter systems on every opening, and a roof assembly rated for the Broward County wind zone. The materials cost difference is real: figure roughly $4,000-$9,000 more than a standard inland conversion for glazing alone, depending on the number of openings. Our written quotes include the exact glazing line items, so the number you see is the number you pay. For a full materials breakdown on your garage, call (971) 497-2402.
Yes, a garage partition ADU is a standard approach in Pembroke Pines, especially for HOAs that want the garage door to remain functional so the home still reads as “single-family” from the street. The partition wall divides the garage into a conditioned studio space with a bathroom and a separate storage bay that keeps the existing garage door. The question on this layout is always the slab: if we need to cut for a new drain line and the slab is below the base flood elevation, the bathroom location has to shift or fill work comes into play. We check the flood panel before we commit to a partition layout, which is why our partition quotes in Pembroke Pines tend to be more accurate than generic estimates.
The shallow water table means any new foundation, slab elevation, or below-grade utility work in parts of Pembroke Pines must meet base flood elevation standards, and in scattered FEMA Special Flood Hazard Areas that can require raising the slab, adding fill, or redesigning the drain path entirely. For a detached garage conversion, this is the line item that breaks budgets: $8,000-$20,000 in additional foundation and site work that a standard interior conversion wouldn’t touch. Before we quote a detached conversion in Pembroke Pines, we pull the flood panel and check your slab elevation against the current map. For an exact number on your detached garage, call (971) 497-2402.
Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Pembroke Pines and surrounding South Florida communities.