Fast, Reliable New Detached ADU Across Pembroke Pines
A new detached ADU in Pembroke Pines typically runs $180,000 to $320,000 all-in, drawings through final inspection, depending on whether you’re building a 600-square-foot studio or a full two-bedroom unit. That’s the real number we put in writing before you sign anything, per Haven Standard Clause 1. Before you spend a dollar on plans, though, there’s a Pembroke Pines specific step that most contractors skip: pulling your recorded plat and community declarations, because many of this city’s 55+ communities have deed restrictions that forbid a second dwelling unit outright.

We’ve been building detached ADUs since 2015, and our New Detached ADU team has worked extensively across Pembroke Pines, including Century Village, Pembroke Falls, SilverLakes, and Chapel Trail. Call (971) 497-2402 and a live person answers, any hour. We’ll tell you honestly whether your lot can hold a detached unit before you’ve spent anything.
Why Ellery ADU Studio Is Pembroke Pines’s Preferred New Detached ADU Company
Most Pembroke Pines homeowners we talk to haven’t yet discovered that their HOA’s 1980s deed restrictions might block a detached ADU even though Florida’s 2023 ADU preemption law, HB 7015, removed many municipal barriers statewide. That law cannot override recorded CC&Rs. We check the plat and the community declarations before we quote, because discovering the prohibition after permit submission wastes weeks and kills projects. That’s the difference between a studio that designs ADUs and a contractor who bid-builds whatever you ask.
Nadia Ellery founded this studio in 2015, the year California’s ADU permitting landscape shifted and the design-build model proved itself. She built The Haven Standard around a simple premise: one contract, one written price, one party responsible. In Pembroke Pines, that means when your HOA requires architectural review, when Broward County flood zone rules add survey and fill requirements, when the Florida Building Code mandates impact-resistant windows, the same team handles all of it. No designer pointing at the builder. No builder blaming the architect.
Every Pembroke Pines project gets a documented photo record on every visit. You’ll see what we found and what we did, not a summary of how it felt. Under Haven Standard Clause 5 (No Surprises), the scope is locked at signing. No door-side upsells, no scope creep.
Our New Detached ADU Services in Pembroke Pines

Custom Built ADU
A custom-built detached ADU in Pembroke Pines typically runs $220,000 to $320,000 for a 1-bed or 2-bed unit with a full kitchen and bath. The price includes architectural drawings, structural engineering, the permit set, foundation work, framing, roofing, all mechanical systems, and the final inspection. On narrow Pembroke Pines lots, where rear-yard setbacks run tight, we often design a single-level footprint that fits within the recorded easements without requiring a variance. Setback variance, the extra distance the city requires between your new ADU and the property line, is expensive and slow. We design around it.

Prefab ADU Installation
Prefab systems from Cover and Dvele can cut Pembroke Pines construction timelines by three to five months compared to stick-built. A prefab ADU installation here typically runs $190,000 to $290,000 including site prep, foundation, utility connections, and the module delivery crane work. The catch in Pembroke Pines is the flood zone. Broward County’s extremely shallow water table and scattered FEMA Special Flood Hazard Areas require base flood elevation compliance on slabs and utilities, which adds survey and fill costs that inland Florida projects never see. We handle that within the same single contract.

Modular ADU
Modular units from Mighty Buildings and Boxabl work well on Pembroke Pines lots with limited access, where a traditional construction crew and material staging would crowd a narrow rear yard. Modular ADU builds here run $185,000 to $265,000 for a studio or one-bedroom. The post-Hurricane Andrew Florida Building Code applies to modular units exactly as it does to site-built, so impact-resistant windows and roof assemblies are mandatory. That’s a real materials cost increase of roughly 12 to 18 percent over what a homeowner in a non-coastal state would budget. We’ll show you the line items.

Studio ADU
A detached studio ADU in Pembroke Pines, typically 400 to 600 square feet, runs $165,000 to $225,000. That’s the most common choice for homeowners in Century Village and similar 55+ communities who want a single-level unit with zero-threshold entry, a walk-in shower, blocking for grab bars, and slip-rated flooring. We’ll specify those aging-in-place features during design, not as an afterthought. For seasonal residents, we also spec low-maintenance exterior finishes that hold up to South Florida humidity without annual repainting.

1-Bed & 2-Bed ADU
A 1-bedroom detached ADU in Pembroke Pines runs $200,000 to $260,000. A 2-bedroom runs $260,000 to $320,000. The difference is mostly square footage, plus an additional bathroom if you want one. On lots in Pembroke Falls and SilverLakes, where plat restrictions push detached structures toward the rear property line, we often recommend a 1-bed design with a slightly larger living area rather than squeezing two bedrooms into a footprint that fights the setbacks.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Pembroke Pines
We specify and coordinate prefab and modular systems from Cover, Dvele, Mighty Buildings, and Boxabl, among others. We don’t sell you a brand, we specify the system that fits your lot, your HOA’s architectural guidelines, and your budget. For Pembroke Pines customers, that often means comparing a Dvele panelized build against a Boxabl modular unit on paper, with real delivery schedules and real foundation costs, before you commit. One contract covers everything: the drawings, the permit set, the factory order, and the site work.
Common New Detached ADU Problems We See in Pembroke Pines Homes

- HOA deed restrictions that prohibit a second unit. Many Pembroke Pines subdivisions have 1980s deed restrictions defining “single-family” to exclude any second dwelling unit on the lot. Florida’s 2023 ADU preemption law cannot override recorded CC&Rs. We pull the plat and community declarations before quoting, every time.
- Narrow rear-yard setbacks and recorded easements. The late 1970s through mid-1990s planned subdivisions that dominate Pembroke Pines were laid out with relatively narrow rear yards and utility easements that limit detached ADU footprints. Designing a structure that violates those setbacks forces a costly redesign or a switch to a garage conversion.
- Base flood elevation compliance surprises. Broward County’s shallow water table and scattered FEMA Special Flood Hazard Areas mean ADU slabs and utilities must meet base flood elevation standards. Survey and fill costs add $8,000 to $25,000 that inland Florida projects avoid. We include these line items in the written price up front.
- Impact-rated materials cost underestimation. The post-Hurricane Andrew Florida Building Code mandates impact-resistant windows, doors, and roof assemblies for all new construction. On a detached ADU, that’s a real cost increase over what national pricing guides show. If a quote looks too low, ask whether it includes Miami-Dade or Broward impact-rated products. We itemize this line by line.
Pricing for New Detached ADU in Pembroke Pines, FL
| ADU Type | Typical All-In Price Range | What’s Included |
|---|---|---|
| Studio ADU (400-600 sq ft) | $165,000-$225,000 | Permit set, slab, utilities, full build, final inspection |
| 1-Bedroom ADU | $200,000-$260,000 | Full kitchen, bath, living area, single-level or loft |
| 2-Bedroom ADU | $260,000-$320,000 | Two bedrooms, full kitchen, one or two baths |
| Prefab ADU (Cover, Dvele) | $190,000-$290,000 | Factory build, delivery, crane, site prep, utility hookups |
| Modular ADU (Mighty Buildings, Boxabl) | $185,000-$265,000 | Module delivery, foundation, mechanical, finishes |
What changes these numbers in Pembroke Pines specifically: HOA-required architectural review can add design revisions, flood zone elevation adds survey and fill costs, and impact-rated windows and roof assemblies are mandatory under the Florida Building Code. We write every price before work starts, per Haven Standard Clause 1. Call (971) 497-2402 for a written quote. Estimates are free, and so is a second opinion on any written estimate you already have in hand.
We Also Serve Cities Near Pembroke Pines

We work across Miami Gardens, Plantation, Hialeah, and North Miami Beach as well. The HOA deed-restriction issue is particularly concentrated in Pembroke Pines, but we pull plats and community declarations in every city where we quote. If you’re in a neighboring Broward or Miami-Dade community, call (971) 497-2402 and we’ll tell you what applies to your lot.
Serving Pembroke Pines, FL - Our Local Coverage Area
We’re based in the Pembroke Pines area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - New Detached ADU in Pembroke Pines

Your HOA’s recorded CC&Rs can flatly prohibit a second dwelling unit on your lot, even though Florida’s 2023 ADU preemption law removed many municipal barriers statewide. In the Century Village community, we reviewed a client’s plat and community declarations before quoting a new detached ADU. The 1980s deed restrictions defined “single-family” to exclude any second dwelling unit, so we pivoted the design to a zero-threshold, single-level accessory structure that met the HOA’s architectural guidelines while preserving aging-in-place features like a walk-in shower and blocking for grab bars. Call (971) 497-2402 and we’ll pull your plat and declarations before you spend anything on plans.
Yes, in many cases, but the footprint will be smaller than you might expect. Pembroke Pines’s late 1970s through mid-1990s planned subdivisions were laid out with relatively narrow rear yards and utility easements that limit detached ADU dimensions. We’ll survey your lot, find the recorded easements, and design within them. If the detached footprint won’t work, a garage conversion or attached addition often will. We’ll show you both options with real drawings and real prices.
Zero-threshold entry, a walk-in shower with blocking for grab bars, wider doorways, single-level layout, slip-rated flooring, and low-maintenance exterior finishes. For seasonal residents in Century Village and similar communities, we also recommend impact-rated windows and a roof assembly rated for hurricane conditions, plus a simple mechanical system that won’t need annual attention. These features are specified during design, not added later as change orders. Call (971) 497-2402 for a written design scope that includes them line by line.
No. HB 7015 removed many municipal barriers to ADUs, but it cannot override recorded CC&Rs. Your HOA’s deed restrictions are private covenants that run with the land, and they still bind you. The only way to know whether your specific community’s declarations prohibit a second unit is to pull the recorded plat and read them. We do that before quoting, every time.
Plan on 12 to 18 percent more for impact-rated windows, doors, and roof assemblies than what national construction pricing guides show. The post-Hurricane Andrew Florida Building Code mandates these materials for all new construction in Broward County. On a $250,000 detached ADU, that’s roughly $30,000 to $45,000 in additional materials cost. We’ll show you the specific line items in your written quote. Call (971) 497-2402 to get your numbers.
Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Pembroke Pines since 2015.